Datacenter Sites in Prince George, Virginia

Prince George has 26 scored datacenter candidate sites averaging 52.4/100 DC Readiness, with a catalogued aggregate of 300 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Prince George, Virginia has 26 scored datacenter candidate sites averaging 52.4/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 64th of 122 Virginia counties by number of sites and 58th by average score. The top-scoring site is EC Coal Prince George County at 58.5/100.

26
Candidate sites
52.4/100
Avg DC Readiness
300 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Prince George

Site-selection context for Prince George

Yessales_tax_exemption
Datacenter tax incentive
7.14¢/kWh
Commercial electricity
6.05¢/kWh
Industrial electricity
3
Fiber providers
Low
Water stress
$4,187
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Prince George compare with other counties in Virginia?

By number of scored sites, Prince George ranks 64th of the 122 Virginia counties with a county page, holding 0.4% of the state's 5,871 sites. Its average DC Readiness of 52.4/100 ranks 58th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1422nd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 4 score 55 or higher.

What types of datacenter sites are in Prince George?

Shovel-Ready sites are the most common (22, 85% of the county's inventory), followed by substation-adjacent (3) and greenfield (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Prince George?

Industrial electricity averages 6.05¢/kWh and commercial 7.14¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 3 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $4,187 an acre.

By site type

Top datacenter sites in Prince George

Top datacenter sites in Prince George
SiteTypeVoltageCapacityQueue waitScore
EC Coal Prince George CountyGreenfield——5.1 yrs58.5
TAP148243Substation-Adjacent115 kV100 MW5.1 yrs57.1
DISPUTANTASubstation-Adjacent115 kV100 MW5.1 yrs56.2
TAP148235Substation-Adjacent115 kV100 MW5.1 yrs55.8
Crosspointe Logistics CentreShovel-Ready——5.1 yrs52.0
Crossings Office ParkShovel-Ready——5.1 yrs51.9
NS - Prince George PropertyShovel-Ready——5.1 yrs51.8
Holland PG PropertyShovel-Ready——5.1 yrs51.8
Prince George Drive SiteShovel-Ready——5.1 yrs51.8
Branchester CommercialShovel-Ready——5.1 yrs51.8
Waterside Drive SiteShovel-Ready——5.1 yrs51.7
Crosspointe Logistics CenterShovel-Ready——5.1 yrs51.6
Mark BricShovel-Ready——5.1 yrs51.6
Hollingsworth Southpoint VP-153Shovel-Ready——5.1 yrs51.6
TriPoint Distribution CenterShovel-Ready——5.1 yrs51.6
Sluka TractShovel-Ready——5.1 yrs51.5
Hardware Drive County Owned LandShovel-Ready——5.1 yrs51.4
Crosspointe Centre Pad SiteShovel-Ready——5.1 yrs51.4
Massenburg SiteShovel-Ready——5.1 yrs51.4
Horne SiteShovel-Ready——5.1 yrs51.4
Southpoint VP-169 Lot 16Shovel-Ready——5.1 yrs51.3
New Bohemia Business ParkShovel-Ready——5.1 yrs51.3
Southpoint VP-166 (lot 15)Shovel-Ready——5.1 yrs51.3
FivePoint Logistics Park - Building 1Shovel-Ready——5.1 yrs51.3
Skalsky 156/460Shovel-Ready——5.1 yrs51.2

Every scored site in Prince George

All 26 sites, best first.

Prince George datacenter FAQ

How many datacenter sites are in Prince George?

26 scored datacenter candidate sites, averaging 52.4/100 DC Readiness. That is the 64th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Prince George?

EC Coal Prince George County scores 58.5/100 DC Readiness, the highest of the 26 scored sites in Prince George (a greenfield site).

Does Prince George offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Prince George?

FEMA's National Risk Index rates Prince George as "Relatively Moderate" (score 30).

What are industrial electricity rates in Prince George?

Average industrial electricity is 6.05¢/kWh and commercial is 7.14¢/kWh in Prince George.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Prince George, Virginia”, https://gridcensus.com/datacenter-sites/virginia/prince-george (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Prince George, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.