Skip to content
Gridcensus

Datacenter Sites in Portsmouth city, Virginia

Portsmouth city has 32 scored datacenter candidate sites averaging 58.5/100 DC Readiness, with a catalogued aggregate of 3,300 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

32
Candidate sites
58.5/100
Avg DC Readiness
3,300 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Portsmouth city

Site-selection context for Portsmouth city

Yessales_tax_exemption
Datacenter tax incentive
4.81¢/kWh
Commercial electricity
4.19¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$5,900
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in Portsmouth city

Top datacenter sites in Portsmouth city
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN115111Substation-Adjacent230 kV300 MW3.8 yrs65.8
REEVES AVESubstation-Adjacent230 kV300 MW3.8 yrs65.6
RURITANSubstation-Adjacent230 kV300 MW3.8 yrs64.8
UNKNOWN115107Substation-Adjacent230 kV300 MW3.8 yrs64.7
UNKNOWN115497Substation-Adjacent230 kV300 MW3.8 yrs64.7
CRANEY ISLANDSubstation-Adjacent230 kV300 MW3.8 yrs64.4
CHURCHLANDSubstation-Adjacent230 kV300 MW3.8 yrs64.3
UNKNOWN114530Substation-Adjacent230 kV300 MW3.8 yrs64.0
LAKE KINGMANSubstation-Adjacent230 kV300 MW3.8 yrs63.5
OZ PortsmouthGreenfield——3.1 yrs63.3
CRITTENDENSubstation-Adjacent230 kV300 MW3.8 yrs62.6
EC Coal Portsmouth cityGreenfield——3.1 yrs60.6
TAP147070Substation-Adjacent115 kV100 MW3.8 yrs60.2
UNKNOWN115112Substation-Adjacent115 kV100 MW3.8 yrs60.2
OZ PortsmouthGreenfield——3.1 yrs60.2
GOSPORTSubstation-Adjacent115 kV100 MW3.8 yrs60.1
EC Coal Portsmouth cityGreenfield——3.1 yrs54.7
500 Washington StShovel-Ready——3.8 yrs54.3
355 Crawford StreetShovel-Ready——3.8 yrs54.3
900 Broad StreetShovel-Ready——3.8 yrs54.2
827 Douglas AvenueShovel-Ready——3.8 yrs54.2
500 Confederate AvenueShovel-Ready——3.8 yrs54.2
Proctor and Gamble BuildingShovel-Ready——3.8 yrs54.2
3290 Airline BlvdShovel-Ready——3.8 yrs53.9
800 Constitution Ave (CS Property)Shovel-Ready——3.8 yrs53.9

Portsmouth city datacenter FAQ

How many datacenter sites are in Portsmouth city?
32 scored datacenter candidate sites, averaging 58.5/100 DC Readiness.
Does Portsmouth city offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in Portsmouth city?
FEMA's National Risk Index rates Portsmouth city as "Relatively Moderate" (score 30).
What are industrial electricity rates in Portsmouth city?
Average industrial electricity is 4.19¢/kWh and commercial is 4.81¢/kWh in Portsmouth city.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Portsmouth city, Virginia. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.