Datacenter Sites in Orange County, Virginia
Orange County has 17 scored datacenter candidate sites averaging 57.0/100 DC Readiness, with a catalogued aggregate of 1,800 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
At a glance
Orange County, Virginia has 17 scored datacenter candidate sites averaging 57.0/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 85th of 122 Virginia counties by number of sites and 11th by average score. The top-scoring site is Substation-Adjacent site · 16d8c421 at 61.5/100.
Site-selection context for Orange County
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
How does Orange County compare with other counties in Virginia?
By number of scored sites, Orange County ranks 85th of the 122 Virginia counties with a county page, holding 0.3% of the state's 5,871 sites. Its average DC Readiness of 57.0/100 ranks 11th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1896th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 12 score 55 or higher.
What types of datacenter sites are in Orange County?
Substation-Adjacent sites are the most common (11, 65% of the county's inventory), followed by shovel-ready (3) and greenfield (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Orange County?
Industrial electricity averages 5.87¢/kWh and commercial 7.48¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 3 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $6,611 an acre.
By site type
Top datacenter sites in Orange County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN116430 | Substation-Adjacent | 230 kV | 300 MW | 5.1 yrs | 61.5 |
| GORDONSVILLE | Substation-Adjacent | 230 kV | 300 MW | 5.1 yrs | 61.4 |
| UNKNOWN116429 | Substation-Adjacent | 230 kV | 300 MW | 5.1 yrs | 61.4 |
| OAK GREEN | Substation-Adjacent | 115 kV | 100 MW | 5.1 yrs | 59.6 |
| TAP140645 | Substation-Adjacent | 115 kV | 100 MW | 5.1 yrs | 59.5 |
| TAP140638 | Substation-Adjacent | 115 kV | 100 MW | 5.1 yrs | 59.0 |
| UNKNOWN116483 | Substation-Adjacent | 115 kV | 100 MW | 5.1 yrs | 59.0 |
| OZ Orange | Greenfield | — | — | 5.1 yrs | 58.9 |
| UNKNOWN116481 | Substation-Adjacent | 115 kV | 100 MW | 5.1 yrs | 58.2 |
| TAP140639 | Substation-Adjacent | 115 kV | 100 MW | 5.1 yrs | 58.0 |
| UNKNOWN116484 | Substation-Adjacent | 115 kV | 100 MW | 5.1 yrs | 57.2 |
| PAYTES DP | Substation-Adjacent | 115 kV | 100 MW | 5.1 yrs | 56.7 |
| Greenfield (UNKNOWN116482 - TAP140639) | Greenfield | 115 kV | 100 MW | 5.1 yrs | 52.9 |
| 281 Kentucky Road | Shovel-Ready | — | — | 5.1 yrs | 52.1 |
| King Property | Shovel-Ready | — | — | 5.1 yrs | 51.5 |
| Thomas E. Lee Industrial Park | Shovel-Ready | — | — | 5.1 yrs | 51.3 |
| Mine Site | Former Mine | — | — | 5.1 yrs | 51.1 |
Every scored site in Orange County
All 17 sites, best first.
- Substation-Adjacent site · 16d8c421 · 61.5
- GORDONSVILLE · 61.4
- Substation-Adjacent site · e18f975f · 61.4
- OAK GREEN · 59.6
- Substation-Adjacent site · 9aabeac3 · 59.5
- Substation-Adjacent site · c9db0804 · 59.0
- Substation-Adjacent site · 68cf7303 · 59.0
- OZ Orange · 58.9
- Substation-Adjacent site · e4be2c52 · 58.2
- Substation-Adjacent site · 8c1ba70b · 58.0
- Substation-Adjacent site · acf268de · 57.2
- PAYTES DP · 56.7
- Greenfield (UNKNOWN116482 - TAP140639) · 52.9
- 281 Kentucky Road · 52.1
- King Property · 51.5
- Thomas E. Lee Industrial Park · 51.3
- Mine Site · 7b79b8fa · 51.1
Orange County datacenter FAQ
How many datacenter sites are in Orange County?
17 scored datacenter candidate sites, averaging 57.0/100 DC Readiness. That is the 85th-most of 122 Virginia counties with five or more sites.
What is the highest-scoring datacenter site in Orange County?
Substation-Adjacent site · 16d8c421 scores 61.5/100 DC Readiness, the highest of the 17 scored sites in Orange County (a substation-adjacent site).
Does Orange County offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in Orange County?
FEMA's National Risk Index rates Orange County as "Relatively Moderate" (score 30).
What are industrial electricity rates in Orange County?
Average industrial electricity is 5.87¢/kWh and commercial is 7.48¢/kWh in Orange County.
More in Virginia
- All datacenter sites in Virginia· 5,871 sites
- Operating datacenters in Virginia
- Electric substations in Virginia
- Buchanan County· 619 sites · avg 50.0
- Wise County· 455 sites · avg 49.8
- Dickenson County· 257 sites · avg 50.5
- Richmond city· 156 sites · avg 55.9
- ROANOKE (CITY)· 154 sites · avg 51.3
- Russell County· 138 sites · avg 51.4
- Substation-Adjacent sites in Virginia
- Shovel-Ready sites in Virginia
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Orange County, Virginia”, https://gridcensus.com/datacenter-sites/virginia/orange-county (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Orange County, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.