Datacenter Sites in Newport News city, Virginia

Newport News city has 46 scored datacenter candidate sites averaging 55.6/100 DC Readiness, with a catalogued aggregate of 3,400 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Newport News city, Virginia has 46 scored datacenter candidate sites averaging 55.6/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 41st of 122 Virginia counties by number of sites and 22nd by average score. The top-scoring site is NEWPORT NEWS at 64.3/100.

46
Candidate sites
55.6/100
Avg DC Readiness
3,400 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Newport News city

Site-selection context for Newport News city

Yessales_tax_exemption
Datacenter tax incentive
4.81¢/kWh
Commercial electricity
4.19¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$5,900
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Newport News city compare with other counties in Virginia?

By number of scored sites, Newport News city ranks 41st of the 122 Virginia counties with a county page, holding 0.8% of the state's 5,871 sites. Its average DC Readiness of 55.6/100 ranks 22nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 836th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 16 score 55 or higher.

What types of datacenter sites are in Newport News city?

Shovel-Ready sites are the most common (26, 57% of the county's inventory), followed by substation-adjacent (14) and industrial (4). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Newport News city?

Industrial electricity averages 4.19¢/kWh and commercial 4.81¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 4 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $5,900 an acre.

By site type

Top datacenter sites in Newport News city

Top datacenter sites in Newport News city
SiteTypeVoltageCapacityQueue waitScore
NEWPORT NEWSSubstation-Adjacent230 kV300 MW5.1 yrs64.3
TAP147951Substation-Adjacent230 kV300 MW5.1 yrs64.1
UNKNOWN115517Substation-Adjacent230 kV300 MW5.1 yrs64.0
UNKNOWN167406Substation-Adjacent230 kV300 MW5.1 yrs62.8
WARWICKSubstation-Adjacent230 kV300 MW5.1 yrs62.8
SEAFORDSubstation-Adjacent230 kV300 MW5.1 yrs62.5
TAP147952Substation-Adjacent230 kV300 MW5.1 yrs62.3
GRAFTONSubstation-Adjacent230 kV300 MW5.1 yrs62.3
FORT EUSTISSubstation-Adjacent230 kV300 MW5.1 yrs62.2
UNKNOWN114527Substation-Adjacent230 kV300 MW5.1 yrs61.4
OZ Newport NewsGreenfield——5.1 yrs59.5
OZ Newport NewsGreenfield——5.1 yrs58.8
COLONYSubstation-Adjacent115 kV100 MW5.1 yrs58.2
TAP147949Substation-Adjacent115 kV100 MW5.1 yrs58.0
UNKNOWN114841Substation-Adjacent115 kV100 MW5.1 yrs57.8
TAP161808Substation-Adjacent115 kV100 MW5.1 yrs57.6
Chase PackagingIndustrial——5.1 yrs54.1
Terminal Avenue Redevelopment Project AreaIndustrial——5.1 yrs54.0
Salvage YardIndustrial——5.1 yrs54.0
1031 44th StreetShovel-Ready——5.1 yrs54.0
District Court Expansion propertyIndustrial——5.1 yrs54.0
900 Jefferson AvenueShovel-Ready——5.1 yrs53.7
9616 & 9800 Hosier StreetShovel-Ready——5.1 yrs52.9
Two Oyster PointShovel-Ready——5.1 yrs52.5
Cedar TwoShovel-Ready——5.1 yrs52.5

Every scored site in Newport News city

All 46 sites, best first.

Newport News city datacenter FAQ

How many datacenter sites are in Newport News city?

46 scored datacenter candidate sites, averaging 55.6/100 DC Readiness. That is the 41st-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Newport News city?

NEWPORT NEWS scores 64.3/100 DC Readiness, the highest of the 46 scored sites in Newport News city (a substation-adjacent site).

Does Newport News city offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Newport News city?

FEMA's National Risk Index rates Newport News city as "Relatively Moderate" (score 30).

What are industrial electricity rates in Newport News city?

Average industrial electricity is 4.19¢/kWh and commercial is 4.81¢/kWh in Newport News city.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Newport News city, Virginia”, https://gridcensus.com/datacenter-sites/virginia/newport-news-city (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Newport News city, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.