Datacenter Sites in HENRY, Virginia

HENRY has 78 scored datacenter candidate sites averaging 48.5/100 DC Readiness, with a catalogued aggregate of 100 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

HENRY, Virginia has 78 scored datacenter candidate sites averaging 48.5/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 15th of 122 Virginia counties by number of sites and 115th by average score. The top-scoring site is OZ Henry · 6376ce7b at 58.1/100.

78
Candidate sites
48.5/100
Avg DC Readiness
100 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in HENRY

Site-selection context for HENRY

Yessales_tax_exemption
Datacenter tax incentive
7.67¢/kWh
Commercial electricity
5.33¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$3,027
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does HENRY compare with other counties in Virginia?

By number of scored sites, HENRY ranks 15th of the 122 Virginia counties with a county page, holding 1.3% of the state's 5,871 sites. Its average DC Readiness of 48.5/100 ranks 115th in the state and is roughly in line with the national average of 53.0. Nationally it has the 451st-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 4 score 55 or higher.

What types of datacenter sites are in HENRY?

Manufacturing sites are the most common (52, 67% of the county's inventory), followed by shovel-ready (19) and greenfield (4). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in HENRY?

Industrial electricity averages 5.33¢/kWh and commercial 7.67¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 4 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $3,027 an acre.

By site type

Top datacenter sites in HENRY

Top datacenter sites in HENRY
SiteTypeVoltageCapacityQueue waitScore
OZ HenryGreenfield——5.1 yrs58.1
EC Coal Henry CountyGreenfield——5.1 yrs57.6
OZ HenryGreenfield——5.1 yrs55.6
OZ HenryGreenfield——5.1 yrs55.5
PHILPOTTSubstation-Adjacent138 kV100 MW5.1 yrs54.0
Patriot Centre Industrial ParkShovel-Ready——5.1 yrs49.1
Patriot Centre IIShovel-Ready——5.1 yrs49.0
North Bowles Industrial ParkShovel-Ready——5.1 yrs48.9
SOUTHPRINT, INC. (COMMERCIAL SCREEN PRINTING)Manufacturing——5.1 yrs48.6
CPFILMS, INC. (NOT AVAILABLE)Manufacturing——5.1 yrs48.6
UK WEST (NONUPHOLSTERED WOOD HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing——5.1 yrs48.6
PACKAGING PRODUCT, INC. (CORRUGATED AND SOLID FIBER BOX MANUFACTURING)Manufacturing——5.1 yrs48.6
STONE DYNAMICS, INC. (NOT AVAILABLE)Manufacturing——5.1 yrs48.6
ICF BuildingShovel-Ready——5.1 yrs48.6
APPLIED FELTS, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——5.1 yrs48.6
UNITED SUBCONTRACTORS, INC. (SHOWCASE, PARTITION, SHELVING, AND LOCKER MANUFACTURING)Manufacturing——5.1 yrs48.5
Patriot Centre Industrial Park - Tract 11Shovel-Ready——5.1 yrs48.3
Patriot Centre Industrial Park - Tract 9NShovel-Ready——5.1 yrs48.2
Commonwealth Crossing Business CentreShovel-Ready——5.1 yrs48.2
Commonwealth Crossing - Tract 2Shovel-Ready——5.1 yrs48.2
Commonwealth Crossing Tract 3Shovel-Ready——5.1 yrs48.0
VIRGINIA BLOWER CO. (AIR PURIFICATION EQUIPMENT MANUFACTURING)Manufacturing——5.1 yrs47.8
WRIGHT & SONS, INC., E. A. (SAWMILLS)Manufacturing——5.1 yrs47.8
Mine SiteFormer Mine——5.1 yrs47.8
PINE PRODUCTS, INC. (SAWMILLS)Manufacturing——5.1 yrs47.8

Every scored site in HENRY

All 78 sites, best first.

HENRY datacenter FAQ

How many datacenter sites are in HENRY?

78 scored datacenter candidate sites, averaging 48.5/100 DC Readiness. That is the 15th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in HENRY?

OZ Henry · 6376ce7b scores 58.1/100 DC Readiness, the highest of the 78 scored sites in HENRY (a greenfield site).

Does HENRY offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in HENRY?

FEMA's National Risk Index rates HENRY as "Relatively Moderate" (score 30).

What are industrial electricity rates in HENRY?

Average industrial electricity is 5.33¢/kWh and commercial is 7.67¢/kWh in HENRY.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in HENRY, Virginia”, https://gridcensus.com/datacenter-sites/virginia/henry (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for HENRY, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.