Datacenter Sites in Halifax, Virginia

Halifax has 40 scored datacenter candidate sites averaging 51.6/100 DC Readiness, with a catalogued aggregate of 1,400 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Halifax, Virginia has 40 scored datacenter candidate sites averaging 51.6/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 47th of 122 Virginia counties by number of sites and 72nd by average score. The top-scoring site is HALIFAX at 60.4/100.

40
Candidate sites
51.6/100
Avg DC Readiness
1,400 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Halifax

Site-selection context for Halifax

Yessales_tax_exemption
Datacenter tax incentive
5.77¢/kWh
Commercial electricity
5.66¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$3,199
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Halifax compare with other counties in Virginia?

By number of scored sites, Halifax ranks 47th of the 122 Virginia counties with a county page, holding 0.7% of the state's 5,871 sites. Its average DC Readiness of 51.6/100 ranks 72nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 969th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 10 score 55 or higher.

What types of datacenter sites are in Halifax?

Industrial sites are the most common (14, 35% of the county's inventory), followed by shovel-ready (11) and substation-adjacent (11). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Halifax?

Industrial electricity averages 5.66¢/kWh and commercial 5.77¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 6 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $3,199 an acre.

By site type

Top datacenter sites in Halifax

Top datacenter sites in Halifax
SiteTypeVoltageCapacityQueue waitScore
HALIFAXSubstation-Adjacent230 kV300 MW5.1 yrs60.4
SOUTH BOSTONSubstation-Adjacent115 kV100 MW5.1 yrs56.1
SINAISubstation-Adjacent115 kV100 MW5.1 yrs56.1
DRYBURGSubstation-Adjacent115 kV100 MW5.1 yrs56.1
WELCOSubstation-Adjacent115 kV100 MW5.1 yrs56.1
REEDY CREEKSubstation-Adjacent115 kV100 MW5.1 yrs56.1
TAP147393Substation-Adjacent115 kV100 MW5.1 yrs56.1
UNKNOWN114630Substation-Adjacent115 kV100 MW5.1 yrs55.3
TAP146923Substation-Adjacent115 kV100 MW5.1 yrs55.2
TAP146924Substation-Adjacent115 kV100 MW5.1 yrs55.2
UNKNOWN171700Substation-Adjacent115 kV100 MW5.1 yrs54.9
OZ HalifaxGreenfield——5.1 yrs54.4
OZ HalifaxGreenfield——5.1 yrs52.0
Wilkins SiteShovel-Ready——5.1 yrs50.6
Huell Matthews Highway & Philpott Road ParcelsIndustrial——5.1 yrs50.2
1011 Drive In RoadShovel-Ready——5.1 yrs50.2
Former Halifax ExxonIndustrial——5.1 yrs50.2
Former Kurz Kasch SiteIndustrial——5.1 yrs50.2
South Boston Fire DepartmentIndustrial——5.1 yrs50.2
Former Randolph Hotel & Parking LotIndustrial——5.1 yrs50.2
Former Daystrom Furniture SiteIndustrial——5.1 yrs50.2
Tax Parcel 4111Industrial——5.1 yrs50.2
Former Waskey's Cleaners SiteIndustrial——5.1 yrs50.2
Former JPS Carter Fabrics PlantIndustrial——5.1 yrs50.1
Former Burlington MillsIndustrial——5.1 yrs50.1

Every scored site in Halifax

All 40 sites, best first.

Halifax datacenter FAQ

How many datacenter sites are in Halifax?

40 scored datacenter candidate sites, averaging 51.6/100 DC Readiness. That is the 47th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Halifax?

HALIFAX scores 60.4/100 DC Readiness, the highest of the 40 scored sites in Halifax (a substation-adjacent site).

Does Halifax offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Halifax?

FEMA's National Risk Index rates Halifax as "Relatively Moderate" (score 30).

What are industrial electricity rates in Halifax?

Average industrial electricity is 5.66¢/kWh and commercial is 5.77¢/kWh in Halifax.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Halifax, Virginia”, https://gridcensus.com/datacenter-sites/virginia/halifax (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Halifax, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.