Datacenter Sites in Halifax, Virginia

Halifax has 40 scored datacenter candidate sites averaging 51.5/100 DC Readiness, with a catalogued aggregate of 1,400 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

40
Candidate sites
51.5/100
Avg DC Readiness
1,400 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Halifax

Site-selection context for Halifax

Yessales_tax_exemption
Datacenter tax incentive
5.77¢/kWh
Commercial electricity
5.66¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$3,199
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in Halifax

Top datacenter sites in Halifax
SiteTypeVoltageCapacityQueue waitScore
HALIFAXSubstation-Adjacent230 kV300 MW3.8 yrs60.1
WELCOSubstation-Adjacent115 kV100 MW3.8 yrs55.8
REEDY CREEKSubstation-Adjacent115 kV100 MW3.8 yrs55.8
DRYBURGSubstation-Adjacent115 kV100 MW3.8 yrs55.8
SINAISubstation-Adjacent115 kV100 MW3.8 yrs55.8
TAP147393Substation-Adjacent115 kV100 MW3.8 yrs55.8
SOUTH BOSTONSubstation-Adjacent115 kV100 MW3.8 yrs55.8
OZ HalifaxGreenfield3.1 yrs55.0
TAP146924Substation-Adjacent115 kV100 MW3.8 yrs54.9
TAP146923Substation-Adjacent115 kV100 MW3.8 yrs54.9
UNKNOWN114630Substation-Adjacent115 kV100 MW3.8 yrs54.9
UNKNOWN171700Substation-Adjacent115 kV100 MW3.8 yrs54.6
OZ HalifaxGreenfield3.1 yrs52.6
Wilkins SiteShovel-Ready3.8 yrs50.2
Former Daystrom Furniture SiteIndustrial3.8 yrs49.8
Halifax TireIndustrial3.8 yrs49.8
1011 Drive In RoadShovel-Ready3.8 yrs49.8
Former Kurz Kasch SiteIndustrial3.8 yrs49.8
Former Halifax ExxonIndustrial3.8 yrs49.8
Former Burlington MillsIndustrial3.8 yrs49.8
Former Waskey's Cleaners SiteIndustrial3.8 yrs49.8
SVTP Building 1Shovel-Ready3.8 yrs49.8
Huell Matthews Highway & Philpott Road ParcelsIndustrial3.8 yrs49.8
South Boston Fire DepartmentIndustrial3.8 yrs49.8
Former Randolph Hotel & Parking LotIndustrial3.8 yrs49.8

Halifax datacenter FAQ

How many datacenter sites are in Halifax?
40 scored datacenter candidate sites, averaging 51.5/100 DC Readiness.
Does Halifax offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in Halifax?
FEMA's National Risk Index rates Halifax as "Relatively Moderate" (score 30).
What are industrial electricity rates in Halifax?
Average industrial electricity is 5.66¢/kWh and commercial is 5.77¢/kWh in Halifax.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Halifax, Virginia. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.