Skip to content
Gridcensus

Datacenter Sites in Greene, Virginia

Greene has 18 scored datacenter candidate sites averaging 51.2/100 DC Readiness, with a catalogued aggregate of 500 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Greene, Virginia has 18 scored datacenter candidate sites averaging 51.2/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 82nd of 122 Virginia counties by number of sites and 87th by average score. The top-scoring site is Substation-Adjacent site · 07968bab at 60.1/100.

18
Candidate sites
51.2/100
Avg DC Readiness
500 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 18 in Greene

Site-selection context for Greene

Yessales_tax_exemption
Datacenter tax incentive
7.73¢/kWh
Commercial electricity
6.05¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$8,303
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Greene compare with other counties in Virginia?

By number of scored sites, Greene ranks 82nd of the 122 Virginia counties with a county page, holding 0.3% of the state's 5,871 sites. Its average DC Readiness of 51.2/100 ranks 87th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1835th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 3 score 55 or higher.

What types of datacenter sites are in Greene?

Shovel-Ready sites are the most common (15, 83% of the county's inventory), followed by substation-adjacent (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Greene?

Industrial electricity averages 6.05¢/kWh and commercial 7.73¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 4 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $8,303 an acre.

By site type

Top datacenter sites in Greene

Top datacenter sites in Greene
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121549Substation-Adjacent230 kV300 MW5.1 yrs60.1
UNKNOWN121551Substation-Adjacent115 kV100 MW5.1 yrs57.3
ELKTON D.P.Substation-Adjacent115 kV100 MW5.1 yrs56.7
Davis Lamb PropertyShovel-Ready——5.1 yrs50.5
RT 33 PropertyShovel-Ready——5.1 yrs50.2
Tennyson PropertyShovel-Ready——5.1 yrs50.1
Tierney Shopping CenterShovel-Ready——5.1 yrs49.9
Enterprise Pointe / Oliver PropertyShovel-Ready——5.1 yrs49.9
Hall PropertyShovel-Ready——5.1 yrs49.7
Villages at Terrace GreeneShovel-Ready——5.1 yrs49.7
27 & 29 Industrial DriveShovel-Ready——5.1 yrs49.7
Tall Oaks Technology CenterShovel-Ready——5.1 yrs49.6
Spotswood Business Park L 10Shovel-Ready——5.1 yrs49.6
Cornerstone SquareShovel-Ready——5.1 yrs49.6
Gateway Market CenterShovel-Ready——5.1 yrs49.6
Greenecroft Town CenterShovel-Ready——5.1 yrs49.5
Lake Saponi & US 29Shovel-Ready——5.1 yrs49.5
Spotswood Trail Lot B on New Life DriveShovel-Ready——5.1 yrs49.5

Every scored site in Greene

All 18 sites, best first.

Greene datacenter FAQ

How many datacenter sites are in Greene?

18 scored datacenter candidate sites, averaging 51.2/100 DC Readiness. That is the 82nd-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Greene?

Substation-Adjacent site · 07968bab scores 60.1/100 DC Readiness, the highest of the 18 scored sites in Greene (a substation-adjacent site).

Does Greene offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Greene?

FEMA's National Risk Index rates Greene as "Relatively Moderate" (score 30).

What are industrial electricity rates in Greene?

Average industrial electricity is 6.05¢/kWh and commercial is 7.73¢/kWh in Greene.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Greene, Virginia”, https://gridcensus.com/datacenter-sites/virginia/greene (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Greene, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.