Datacenter Sites in Grayson County, Virginia
Grayson County has 14 scored datacenter candidate sites averaging 48.4/100 DC Readiness, with a catalogued aggregate of 0 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
At a glance
Grayson County, Virginia has 14 scored datacenter candidate sites averaging 48.4/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 90th of 122 Virginia counties by number of sites and 116th by average score. The top-scoring site is OZ Grayson at 54.0/100.
Site-selection context for Grayson County
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
How does Grayson County compare with other counties in Virginia?
By number of scored sites, Grayson County ranks 90th of the 122 Virginia counties with a county page, holding 0.2% of the state's 5,871 sites. Its average DC Readiness of 48.4/100 ranks 116th in the state and is roughly in line with the national average of 53.0. Nationally it has the 2089th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 0 score 55 or higher.
What types of datacenter sites are in Grayson County?
Manufacturing sites are the most common (7, 50% of the county's inventory), followed by former mine (3) and industrial (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Grayson County?
Industrial electricity averages 5.33¢/kWh and commercial 7.67¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 8 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $4,673 an acre.
By site type
Top datacenter sites in Grayson County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Grayson | Greenfield | — | — | 5.1 yrs | 54.0 |
| EC FFE Grayson County | Greenfield | — | — | 5.1 yrs | 52.8 |
| STEWART FURNITURE DESIGN, INC. (UPHOLSTERED HOUSEHOLD FURNITURE MANUFACTURING) | Manufacturing | — | — | 5.1 yrs | 48.4 |
| C & B LUMBER, INC. (CUT STOCK, RESAWING LUMBER, AND PLANING) | Manufacturing | — | — | 5.1 yrs | 48.3 |
| CARDINAL STONE CO. (CUT STONE AND STONE PRODUCT MANUFACTURING) | Manufacturing | — | — | 5.1 yrs | 48.2 |
| NAUTILUS, INC. (SPORTING AND ATHLETIC GOODS MANUFACTURING) | Manufacturing | — | — | 5.1 yrs | 47.8 |
| TRITEX, LLC (NOT AVAILABLE) | Manufacturing | — | — | 5.1 yrs | 47.8 |
| DARCO SOUTHERN, INC. (GASKET, PACKING, AND SEALING DEVICE MANUFACTURING) | Manufacturing | — | — | 5.1 yrs | 47.8 |
| INDEPENDENCE LUMBER, INC. (SAWMILLS) | Manufacturing | — | — | 5.1 yrs | 47.5 |
| Mine Site | Former Mine | — | — | 5.1 yrs | 47.2 |
| Mt Rogers School | Industrial | — | — | 5.1 yrs | 47.1 |
| Grayson Garment | Industrial | — | — | 5.1 yrs | 47.1 |
| Mine Site | Former Mine | — | — | 5.1 yrs | 47.0 |
| Mine Site | Former Mine | — | — | 5.1 yrs | 46.4 |
Every scored site in Grayson County
All 14 sites, best first.
- OZ Grayson · 54.0
- EC FFE Grayson County · 52.8
- STEWART FURNITURE DESIGN, INC. (UPHOLSTERED HOUSEHOLD FURNITURE MANUFACTURING) · 48.4
- C & B LUMBER, INC. (CUT STOCK, RESAWING LUMBER, AND PLANING) · 48.3
- CARDINAL STONE CO. (CUT STONE AND STONE PRODUCT MANUFACTURING) · 48.2
- NAUTILUS, INC. (SPORTING AND ATHLETIC GOODS MANUFACTURING) · 47.8
- TRITEX, LLC (NOT AVAILABLE) · 47.8
- DARCO SOUTHERN, INC. (GASKET, PACKING, AND SEALING DEVICE MANUFACTURING) · 47.8
- INDEPENDENCE LUMBER, INC. (SAWMILLS) · 47.5
- Mine Site · 22966bc8 · 47.2
- Mt Rogers School · 47.1
- Grayson Garment · 47.1
- Mine Site · ea974766 · 47.0
- Mine Site · 03d3e1e7 · 46.4
Grayson County datacenter FAQ
How many datacenter sites are in Grayson County?
14 scored datacenter candidate sites, averaging 48.4/100 DC Readiness. That is the 90th-most of 122 Virginia counties with five or more sites.
What is the highest-scoring datacenter site in Grayson County?
OZ Grayson scores 54.0/100 DC Readiness, the highest of the 14 scored sites in Grayson County (a greenfield site).
Does Grayson County offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in Grayson County?
FEMA's National Risk Index rates Grayson County as "Relatively Moderate" (score 30).
What are industrial electricity rates in Grayson County?
Average industrial electricity is 5.33¢/kWh and commercial is 7.67¢/kWh in Grayson County.
More in Virginia
- All datacenter sites in Virginia· 5,871 sites
- Operating datacenters in Virginia
- Electric substations in Virginia
- Buchanan County· 619 sites · avg 50.0
- Wise County· 455 sites · avg 49.8
- Dickenson County· 257 sites · avg 50.5
- Richmond city· 156 sites · avg 55.9
- ROANOKE (CITY)· 154 sites · avg 51.3
- Russell County· 138 sites · avg 51.4
- Manufacturing sites in Virginia
- Former Mine sites in Virginia
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Grayson County, Virginia”, https://gridcensus.com/datacenter-sites/virginia/grayson-county (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Grayson County, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.