Datacenter Sites in Gloucester, Virginia

Gloucester has 21 scored datacenter candidate sites averaging 46.8/100 DC Readiness, with a catalogued aggregate of 0 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Gloucester, Virginia has 21 scored datacenter candidate sites averaging 46.8/100 DC Readiness, about 10% below the Virginia average of 52.2. It ranks 73rd of 122 Virginia counties by number of sites and 120th by average score. The top-scoring site is Rt 17 and Hayes Road at 47.8/100.

21
Candidate sites
46.8/100
Avg DC Readiness
0 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 21 in Gloucester

Site-selection context for Gloucester

Yessales_tax_exemption
Datacenter tax incentive
4.81¢/kWh
Commercial electricity
4.19¢/kWh
Industrial electricity
2
Fiber providers
Low
Water stress
$6,053
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Gloucester compare with other counties in Virginia?

By number of scored sites, Gloucester ranks 73rd of the 122 Virginia counties with a county page, holding 0.4% of the state's 5,871 sites. Its average DC Readiness of 46.8/100 ranks 120th in the state and is about 12% below the national average of 53.0. Nationally it has the 1665th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 0 score 55 or higher.

What types of datacenter sites are in Gloucester?

Shovel-Ready sites are the most common (19, 90% of the county's inventory), followed by greenfield (1) and former mine (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Gloucester?

Industrial electricity averages 4.19¢/kWh and commercial 4.81¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 2 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $6,053 an acre.

By site type

Top datacenter sites in Gloucester

Top datacenter sites in Gloucester
SiteTypeVoltageCapacityQueue waitScore
Rt 17 and Hayes RoadShovel-Ready——5.1 yrs47.8
OZ GloucesterGreenfield——5.1 yrs47.4
York River CrossingShovel-Ready——5.1 yrs47.3
Sears PropertyShovel-Ready——5.1 yrs47.2
2988 George Washington Memorial HwyShovel-Ready——5.1 yrs47.2
Hayes Office SpaceShovel-Ready——5.1 yrs47.2
Rt 17 and Guinea RoadShovel-Ready——5.1 yrs47.2
Former Oyster Cove Boat WorksShovel-Ready——5.1 yrs46.9
6420 Enterprise CourtShovel-Ready——5.1 yrs46.8
Old Page Middle SchoolShovel-Ready——5.1 yrs46.7
Mine SiteFormer Mine——5.1 yrs46.6
Commercial Office BuildingShovel-Ready——5.1 yrs46.6
3659 George Washington Memorial HwyShovel-Ready——5.1 yrs46.6
Robert S. Brown Family TrustShovel-Ready——5.1 yrs46.5
Gloucester Business ParkShovel-Ready——5.1 yrs46.4
Canon WayShovel-Ready——5.1 yrs46.4
8316 George Washington Memorial HighwayShovel-Ready——5.1 yrs46.2
Lemon's LoopShovel-Ready——5.1 yrs46.2
9991 John Clayton Memorial HighwayShovel-Ready——5.1 yrs46.2
Birdsall Property-1Shovel-Ready——5.1 yrs46.2
Birdsall Property-2Shovel-Ready——5.1 yrs46.2

Every scored site in Gloucester

All 21 sites, best first.

Gloucester datacenter FAQ

How many datacenter sites are in Gloucester?

21 scored datacenter candidate sites, averaging 46.8/100 DC Readiness. That is the 73rd-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Gloucester?

Rt 17 and Hayes Road scores 47.8/100 DC Readiness, the highest of the 21 scored sites in Gloucester (a shovel-ready site).

Does Gloucester offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Gloucester?

FEMA's National Risk Index rates Gloucester as "Relatively Moderate" (score 30).

What are industrial electricity rates in Gloucester?

Average industrial electricity is 4.19¢/kWh and commercial is 4.81¢/kWh in Gloucester.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Gloucester, Virginia”, https://gridcensus.com/datacenter-sites/virginia/gloucester (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Gloucester, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.