Datacenter Sites in FRANKLIN, Virginia

FRANKLIN has 47 scored datacenter candidate sites averaging 49.5/100 DC Readiness, with a catalogued aggregate of 700 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

FRANKLIN, Virginia has 47 scored datacenter candidate sites averaging 49.5/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 40th of 122 Virginia counties by number of sites and 109th by average score. The top-scoring site is FRANKLIN at 55.0/100.

47
Candidate sites
49.5/100
Avg DC Readiness
700 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in FRANKLIN

Site-selection context for FRANKLIN

Yessales_tax_exemption
Datacenter tax incentive
7.95¢/kWh
Commercial electricity
5.81¢/kWh
Industrial electricity
8
Fiber providers
Low
Water stress
$4,475
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does FRANKLIN compare with other counties in Virginia?

By number of scored sites, FRANKLIN ranks 40th of the 122 Virginia counties with a county page, holding 0.8% of the state's 5,871 sites. Its average DC Readiness of 49.5/100 ranks 109th in the state and is roughly in line with the national average of 53.0. Nationally it has the 809th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 1 score 55 or higher.

What types of datacenter sites are in FRANKLIN?

Manufacturing sites are the most common (27, 57% of the county's inventory), followed by shovel-ready (10) and substation-adjacent (7). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in FRANKLIN?

Industrial electricity averages 5.81¢/kWh and commercial 7.95¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 8 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $4,475 an acre.

By site type

Top datacenter sites in FRANKLIN

Top datacenter sites in FRANKLIN
SiteTypeVoltageCapacityQueue waitScore
FRANKLINSubstation-Adjacent138 kV100 MW5.1 yrs55.0
TANK HILLSubstation-Adjacent138 kV100 MW5.1 yrs54.9
UNKNOWN121250Substation-Adjacent138 kV100 MW5.1 yrs54.9
BLAINESubstation-Adjacent138 kV100 MW5.1 yrs54.9
TAP147348Substation-Adjacent138 kV100 MW5.1 yrs54.9
THORNTONSubstation-Adjacent138 kV100 MW5.1 yrs54.8
PENHOOKSubstation-Adjacent138 kV100 MW5.1 yrs54.3
Summit View Business ParkShovel-Ready——5.1 yrs49.1
Summit View Business Park - Dogwood SiteShovel-Ready——5.1 yrs48.9
FRANKLIN COUNTY NEWSPAPERS, INC. (PREPRESS SERVICES)Manufacturing——5.1 yrs48.7
13400 Booker T. Washington Hwy (Westlake)Shovel-Ready——5.1 yrs48.7
FRANKLIN READY MIX CONCRETE, INC. (READY-MIX CONCRETE MANUFACTURING)Manufacturing——5.1 yrs48.7
MOD-U-KRAF HOMES, LLC (MANUFACTURED HOME (MOBILE HOME) MANUFACTURING)Manufacturing——5.1 yrs48.7
NEWBOLD CORP. (OTHER COMMERCIAL PRINTING)Manufacturing——5.1 yrs48.7
SHREDDED PRODUCTS CORP. (SECONDARY SMELTING, REFINING, AND ALLOYING OF NONFERROUS METAL (EXCEPT COPPER AND ALUMINUM))Manufacturing——5.1 yrs48.6
RONILE, INC. (YARN SPINNING MILLS)Manufacturing——5.1 yrs48.6
UTTERMOST CO., THE (ALL OTHER MISCELLANEOUS MANUFACTURING)Manufacturing——5.1 yrs48.6
SOUTHERN HERITAGE HOMES, INC. (MANUFACTURED HOME (MOBILE HOME) MANUFACTURING)Manufacturing——5.1 yrs48.6
DOORS & MORE (OTHER MILLWORK (INCLUDING FLOORING ))Manufacturing——5.1 yrs48.6
FLEETWOOD HOMES OF VIRGINIA, INC. (PREFABRICATED WOOD BUILDING MANUFACTURING)Manufacturing——5.1 yrs48.6
BLACKWATER DOOR & MILLWORK, INC. (WOOD WINDOW AND DOOR MANUFACTURING)Manufacturing——5.1 yrs48.6
276 Westlake Road - Building 4Shovel-Ready——5.1 yrs48.6
BLUE RIDGE MOUNTAIN CABINETS (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING)Manufacturing——5.1 yrs48.6
ERATH VENEER CORP. OF VIRGINIA (HARDWOOD VENEER AND PLYWOOD MANUFACTURING)Manufacturing——5.1 yrs48.6
Goodwill- Rocky MountShovel-Ready——5.1 yrs48.6

Every scored site in FRANKLIN

All 47 sites, best first.

FRANKLIN datacenter FAQ

How many datacenter sites are in FRANKLIN?

47 scored datacenter candidate sites, averaging 49.5/100 DC Readiness. That is the 40th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in FRANKLIN?

FRANKLIN scores 55.0/100 DC Readiness, the highest of the 47 scored sites in FRANKLIN (a substation-adjacent site).

Does FRANKLIN offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in FRANKLIN?

FEMA's National Risk Index rates FRANKLIN as "Relatively Moderate" (score 30).

What are industrial electricity rates in FRANKLIN?

Average industrial electricity is 5.81¢/kWh and commercial is 7.95¢/kWh in FRANKLIN.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in FRANKLIN, Virginia”, https://gridcensus.com/datacenter-sites/virginia/franklin (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for FRANKLIN, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.