Skip to content
Gridcensus

Datacenter Sites in Fairfax, Virginia

Fairfax has 52 scored datacenter candidate sites averaging 57.8/100 DC Readiness, with a catalogued aggregate of 4,000 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

52
Candidate sites
57.8/100
Avg DC Readiness
4,000 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Fairfax

Site-selection context for Fairfax

Yessales_tax_exemption
Datacenter tax incentive
4.90¢/kWh
Commercial electricity
4.40¢/kWh
Industrial electricity
13
Fiber providers
Low
Water stress
$17,494
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in Fairfax

Top datacenter sites in Fairfax
SiteTypeVoltageCapacityQueue waitScore
OXSubstation-Adjacent500 kV1,000 MW3.8 yrs68.2
OZ FairfaxGreenfield——3.1 yrs65.4
UNKNOWN116656Substation-Adjacent230 kV300 MW3.8 yrs64.9
BRADDOCKSubstation-Adjacent230 kV300 MW3.8 yrs64.5
BURKE-SIDEBURNSubstation-Adjacent230 kV300 MW3.8 yrs64.4
RAVENSWORTHSubstation-Adjacent230 kV300 MW3.8 yrs64.4
SIDEBURNSubstation-Adjacent230 kV300 MW3.8 yrs64.4
KEENE MILLSubstation-Adjacent230 kV300 MW3.8 yrs64.2
LAKERIDGESubstation-Adjacent230 kV300 MW3.8 yrs63.9
UNKNOWN116837Substation-Adjacent230 kV300 MW3.8 yrs63.9
UNKNOWN116742Substation-Adjacent230 kV300 MW3.8 yrs63.9
OCCOQUANSubstation-Adjacent230 kV300 MW3.8 yrs63.8
OZ FairfaxGreenfield——3.1 yrs63.5
OZ FairfaxGreenfield——3.1 yrs63.3
OZ FairfaxGreenfield——3.1 yrs62.7
One Freedom Square at Reston Town CenterShovel-Ready——3.8 yrs55.6
11600 Sunrise Valley DriveShovel-Ready——3.8 yrs55.6
Plaza America Tower 1Shovel-Ready——3.8 yrs55.6
2770-2782 Towerview RoadShovel-Ready——3.8 yrs55.6
Two Fountain Square at Reston Town CenterShovel-Ready——3.8 yrs55.6
Reston Town Center West IShovel-Ready——3.8 yrs55.6
12110 Sunset Hills Blvd - RTC West IIShovel-Ready——3.8 yrs55.6
2291 Wood Oak DrShovel-Ready——3.8 yrs55.6
2340 Dulles Corner BoulevardShovel-Ready——3.8 yrs55.6
Innovation Center SouthShovel-Ready——3.8 yrs55.5

Fairfax datacenter FAQ

How many datacenter sites are in Fairfax?
52 scored datacenter candidate sites, averaging 57.8/100 DC Readiness.
Does Fairfax offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in Fairfax?
FEMA's National Risk Index rates Fairfax as "Relatively Moderate" (score 30).
What are industrial electricity rates in Fairfax?
Average industrial electricity is 4.40¢/kWh and commercial is 4.90¢/kWh in Fairfax.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Fairfax, Virginia. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.