Datacenter Sites in Arlington, Virginia

Arlington has 23 scored datacenter candidate sites averaging 55.6/100 DC Readiness, with a catalogued aggregate of 300 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Arlington, Virginia has 23 scored datacenter candidate sites averaging 55.6/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 67th of 122 Virginia counties by number of sites and 22nd by average score. The top-scoring site is GLEN CARLYN at 64.8/100.

23
Candidate sites
55.6/100
Avg DC Readiness
300 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 23 in Arlington

Site-selection context for Arlington

Yessales_tax_exemption
Datacenter tax incentive
4.81¢/kWh
Commercial electricity
4.19¢/kWh
Industrial electricity
10
Fiber providers
Low
Water stress
$150,000
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Arlington compare with other counties in Virginia?

By number of scored sites, Arlington ranks 67th of the 122 Virginia counties with a county page, holding 0.4% of the state's 5,871 sites. Its average DC Readiness of 55.6/100 ranks 22nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 1558th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 12 score 55 or higher.

What types of datacenter sites are in Arlington?

Shovel-Ready sites are the most common (21, 91% of the county's inventory), followed by greenfield (1) and substation-adjacent (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Arlington?

Industrial electricity averages 4.19¢/kWh and commercial 4.81¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 10 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $150,000 an acre.

By site type

Top datacenter sites in Arlington

Top datacenter sites in Arlington
SiteTypeVoltageCapacityQueue waitScore
GLEN CARLYNSubstation-Adjacent230 kV300 MW5.1 yrs64.8
The TowersShovel-Ready——5.1 yrs55.8
Jefferson PlazaShovel-Ready——5.1 yrs55.8
1777 N Kent St - Rosslyn Plaza Bldg NorthShovel-Ready——5.1 yrs55.8
1812 North Moore TowerShovel-Ready——5.1 yrs55.8
1101 Wilson BoulevardShovel-Ready——5.1 yrs55.8
1300 N 17th St - Arlington TowerShovel-Ready——5.1 yrs55.8
1500 Wilson BoulevardShovel-Ready——5.1 yrs55.7
Heyday at 1310Shovel-Ready——5.1 yrs55.7
1501 Langston BoulevardShovel-Ready——5.1 yrs55.7
2311 WilsonShovel-Ready——5.1 yrs55.6
3100 Clarendon BlvdShovel-Ready——5.1 yrs55.6
2231 Crystal Dr - Crystal Park ThreeShovel-Ready——5.1 yrs54.9
2121 Crystal Drive - Crystal Park TwoShovel-Ready——5.1 yrs54.9
2345 Crystal Drive - Crystal Park FourShovel-Ready——5.1 yrs54.9
OZ ArlingtonGreenfield——5.1 yrs54.7
Fuse at Mason SquareShovel-Ready——5.1 yrs54.7
4040 Wilson BlvdShovel-Ready——5.1 yrs54.7
Virginia Square PlazaShovel-Ready——5.1 yrs54.7
4250 N Fairfax DriveShovel-Ready——5.1 yrs54.6
Ballston Metro CenterShovel-Ready——5.1 yrs54.6
Ballston Exchange IShovel-Ready——5.1 yrs54.6
4401 Wilson BoulevardShovel-Ready——5.1 yrs54.6

Every scored site in Arlington

All 23 sites, best first.

Arlington datacenter FAQ

How many datacenter sites are in Arlington?

23 scored datacenter candidate sites, averaging 55.6/100 DC Readiness. That is the 67th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Arlington?

GLEN CARLYN scores 64.8/100 DC Readiness, the highest of the 23 scored sites in Arlington (a substation-adjacent site).

Does Arlington offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Arlington?

FEMA's National Risk Index rates Arlington as "Relatively Moderate" (score 30).

What are industrial electricity rates in Arlington?

Average industrial electricity is 4.19¢/kWh and commercial is 4.81¢/kWh in Arlington.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Arlington, Virginia”, https://gridcensus.com/datacenter-sites/virginia/arlington (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Arlington, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.