Amherst has 13 scored datacenter candidate sites averaging 52.1/100 DC Readiness, with a catalogued aggregate of 300 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
At a glance
Amherst, Virginia has 13 scored datacenter candidate sites averaging 52.1/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 94th of 122 Virginia counties by number of sites and 61st by average score. The top-scoring site is Substation-Adjacent site · 208d5eb6 at 56.7/100.
Site-selection context for Amherst
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
How does Amherst compare with other counties in Virginia?
By number of scored sites, Amherst ranks 94th of the 122 Virginia counties with a county page, holding 0.2% of the state's 5,871 sites. Its average DC Readiness of 52.1/100 ranks 61st in the state and is roughly in line with the national average of 53.0. Nationally it has the 2184th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 3 score 55 or higher.
What types of datacenter sites are in Amherst?
Shovel-Ready sites are the most common (9, 69% of the county's inventory), followed by substation-adjacent (3) and former mine (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Amherst?
Industrial electricity averages 5.62¢/kWh and commercial 7.76¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 3 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $5,795 an acre.
By site type
Top datacenter sites in Amherst
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN121392 | Substation-Adjacent | 138 kV | 100 MW | 5.1 yrs | 56.7 |
| BOXWOOD | Substation-Adjacent | 138 kV | 100 MW | 5.1 yrs | 56.7 |
| CLIFFORD | Substation-Adjacent | 138 kV | 100 MW | 5.1 yrs | 55.7 |
| Dillard Tract | Shovel-Ready | — | — | 5.1 yrs | 51.8 |
| Training Center Site | Shovel-Ready | — | — | 5.1 yrs | 51.7 |
| Rt. 210 Property | Shovel-Ready | — | — | 5.1 yrs | 51.3 |
| Dillard Tract - Lot B | Shovel-Ready | — | — | 5.1 yrs | 51.1 |
| Barnes Brockman Business and Industrial Park | Shovel-Ready | — | — | 5.1 yrs | 50.6 |
| Former Old Virginia Brick Company | Shovel-Ready | — | — | 5.1 yrs | 50.5 |
| Mine Site | Former Mine | — | — | 5.1 yrs | 50.5 |
| Amelon Commerce Center Lot 6 Building | Shovel-Ready | — | — | 5.1 yrs | 50.4 |
| Amelon Commerce Center | Shovel-Ready | — | — | 5.1 yrs | 50.4 |
| Old Virginia Brick -1A | Shovel-Ready | — | — | 5.1 yrs | 50.3 |
Every scored site in Amherst
All 13 sites, best first.
- Substation-Adjacent site · 208d5eb6 · 56.7
- BOXWOOD · 56.7
- CLIFFORD · 55.7
- Dillard Tract · 51.8
- Training Center Site · 51.7
- Rt. 210 Property · 51.3
- Dillard Tract - Lot B · 51.1
- Barnes Brockman Business and Industrial Park · 50.6
- Former Old Virginia Brick Company · 50.5
- Mine Site · 9c866a98 · 50.5
- Amelon Commerce Center Lot 6 Building · 50.4
- Amelon Commerce Center · 50.4
- Old Virginia Brick -1A · 50.3
Amherst datacenter FAQ
How many datacenter sites are in Amherst?
13 scored datacenter candidate sites, averaging 52.1/100 DC Readiness. That is the 94th-most of 122 Virginia counties with five or more sites.
What is the highest-scoring datacenter site in Amherst?
Substation-Adjacent site · 208d5eb6 scores 56.7/100 DC Readiness, the highest of the 13 scored sites in Amherst (a substation-adjacent site).
Does Amherst offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in Amherst?
FEMA's National Risk Index rates Amherst as "Relatively Moderate" (score 30).
What are industrial electricity rates in Amherst?
Average industrial electricity is 5.62¢/kWh and commercial is 7.76¢/kWh in Amherst.
More in Virginia
- All datacenter sites in Virginia· 5,871 sites
- Operating datacenters in Virginia
- Electric substations in Virginia
- Buchanan County· 619 sites · avg 50.0
- Wise County· 455 sites · avg 49.8
- Dickenson County· 257 sites · avg 50.5
- Richmond city· 156 sites · avg 55.9
- ROANOKE (CITY)· 154 sites · avg 51.3
- Russell County· 138 sites · avg 51.4
- Shovel-Ready sites in Virginia
- Substation-Adjacent sites in Virginia
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Amherst, Virginia”, https://gridcensus.com/datacenter-sites/virginia/amherst (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Amherst, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.