Datacenter Sites in ALLEGHANY, Virginia

ALLEGHANY has 44 scored datacenter candidate sites averaging 49.8/100 DC Readiness, with a catalogued aggregate of 227 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

44
Candidate sites
49.8/100
Avg DC Readiness
227 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating

Site-selection context for ALLEGHANY

Yessales_tax_exemption
Datacenter tax incentive
4.81¢/kWh
Commercial electricity
4.19¢/kWh
Industrial electricity
2
Fiber providers
Low
Water stress
$3,293
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in ALLEGHANY

Top datacenter sites in ALLEGHANY
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121391Substation-Adjacent138 kV100 MW3.0 yrs64.4
Covington FacilityBrownfield27 MW3.1 yrs60.5
OZ AlleghanyGreenfield3.1 yrs59.0
Greenfield (FUDGE HOLLOW - RONCEVERTE)Greenfield138 kV100 MW3.0 yrs58.7
EC Near Covington FacilityGreenfield3.1 yrs58.1
EC Near Covington FacilityGreenfield3.1 yrs57.4
EC Near Covington FacilityGreenfield3.1 yrs57.4
EC Near Covington FacilityGreenfield3.1 yrs57.3
EC Coal Alleghany CountyGreenfield3.1 yrs57.2
EC Near Covington FacilityGreenfield3.1 yrs56.5
EC Near Covington FacilityGreenfield3.1 yrs56.4
EC Near Covington FacilityGreenfield3.1 yrs56.2
EC Near Covington FacilityGreenfield3.1 yrs55.8
EC Near Covington FacilityGreenfield3.1 yrs53.0
EC Near Covington FacilityGreenfield3.1 yrs52.9
BRADLEY'S SAWMILL, INC. (SAWMILLS)Manufacturing48.7
SONOCO PRODUCTS CO. (FIBER CAN, TUBE, DRUM, AND SIMILAR PRODUCTS MANUFACTURING)Manufacturing48.7
BACOVA GUILD LTD. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing48.7
PARKER HANNIFIN CORP. (RUBBER PRODUCT MANUFACTURING FOR MECHANICAL USE)Manufacturing48.7
PARKER, POWERTRAIN DIV. (ALL OTHER RUBBER PRODUCT MANUFACTURING)Manufacturing48.7
CREATIVE FABRICATION, INC. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING)Manufacturing48.7
BOLIVIA LUMBER CO. (WOOD CONTAINER AND PALLET MANUFACTURING)Manufacturing48.7
BENNETT LOGGING & LUMBER, INC. (SAWMILLS)Manufacturing48.7
J & D PALLETS, INC. (WOOD CONTAINER AND PALLET MANUFACTURING)Manufacturing48.7
JENFAB, INC. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING)Manufacturing48.7

ALLEGHANY datacenter FAQ

How many datacenter sites are in ALLEGHANY?
44 scored datacenter candidate sites, averaging 49.8/100 DC Readiness.
Does ALLEGHANY offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in ALLEGHANY?
FEMA's National Risk Index rates ALLEGHANY as "Relatively Moderate" (score 30).
What are industrial electricity rates in ALLEGHANY?
Average industrial electricity is 4.19¢/kWh and commercial is 4.81¢/kWh in ALLEGHANY.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ALLEGHANY, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.