Skip to content
Gridcensus

Datacenter Sites in ALLEGHANY, Virginia

ALLEGHANY has 43 scored datacenter candidate sites averaging 51.5/100 DC Readiness, with a catalogued aggregate of 200 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

ALLEGHANY, Virginia has 43 scored datacenter candidate sites averaging 51.5/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 42nd of 122 Virginia counties by number of sites and 74th by average score. The top-scoring site is OZ Alleghany at 57.1/100.

43
Candidate sites
51.5/100
Avg DC Readiness
200 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in ALLEGHANY

Site-selection context for ALLEGHANY

Yessales_tax_exemption
Datacenter tax incentive
4.81¢/kWh
Commercial electricity
4.19¢/kWh
Industrial electricity
2
Fiber providers
Low
Water stress
$3,293
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does ALLEGHANY compare with other counties in Virginia?

By number of scored sites, ALLEGHANY ranks 42nd of the 122 Virginia counties with a county page, holding 0.7% of the state's 5,871 sites. Its average DC Readiness of 51.5/100 ranks 74th in the state and is roughly in line with the national average of 53.0. Nationally it has the 887th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 9 score 55 or higher.

What types of datacenter sites are in ALLEGHANY?

Greenfield sites are the most common (12, 28% of the county's inventory), followed by manufacturing (11) and shovel-ready (10). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in ALLEGHANY?

Industrial electricity averages 4.19¢/kWh and commercial 4.81¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 2 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $3,293 an acre.

By site type

Top datacenter sites in ALLEGHANY

Top datacenter sites in ALLEGHANY
SiteTypeVoltageCapacityQueue waitScore
OZ AlleghanyGreenfield——5.1 yrs57.1
UNKNOWN121391Substation-Adjacent138 kV100 MW5.1 yrs57.0
EC Near Covington FacilityGreenfield——5.1 yrs56.6
FUDGE HOLLOWSubstation-Adjacent138 kV100 MW5.1 yrs56.2
EC Near Covington FacilityGreenfield——5.1 yrs55.9
EC Near Covington FacilityGreenfield——5.1 yrs55.8
EC Near Covington FacilityGreenfield——5.1 yrs55.8
EC Coal Alleghany CountyGreenfield——5.1 yrs55.3
EC Near Covington FacilityGreenfield——5.1 yrs55.0
EC Near Covington FacilityGreenfield——5.1 yrs54.8
EC Near Covington FacilityGreenfield——5.1 yrs54.7
EC Near Covington FacilityGreenfield——5.1 yrs54.3
EC Near Covington FacilityGreenfield——5.1 yrs51.5
EC Near Covington FacilityGreenfield——5.1 yrs51.3
Marshall FarmShovel-Ready——5.1 yrs50.4
Alleghany Regional Commerce CenterShovel-Ready——5.1 yrs50.3
Alleghany Regional Commerce Center Pad SiteShovel-Ready——5.1 yrs50.3
Alleghany Innovation ParkShovel-Ready——5.1 yrs50.3
MEADWESTVACO CORP. (PAPER (EXCEPT NEWSPRINT) MILLS)Manufacturing——5.1 yrs49.9
Alleghany Co Public Works GarageIndustrial——5.1 yrs49.9
J & D PALLETS, INC. (WOOD CONTAINER AND PALLET MANUFACTURING)Manufacturing——5.1 yrs49.9
Parker HannifinShovel-Ready——5.1 yrs49.9
PARKER, POWERTRAIN DIV. (ALL OTHER RUBBER PRODUCT MANUFACTURING)Manufacturing——5.1 yrs49.9
Low Moor Medical LotIndustrial——5.1 yrs49.9
Howard SiteIndustrial——5.1 yrs49.9

Every scored site in ALLEGHANY

All 43 sites, best first.

ALLEGHANY datacenter FAQ

How many datacenter sites are in ALLEGHANY?

43 scored datacenter candidate sites, averaging 51.5/100 DC Readiness. That is the 42nd-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in ALLEGHANY?

OZ Alleghany scores 57.1/100 DC Readiness, the highest of the 43 scored sites in ALLEGHANY (a greenfield site).

Does ALLEGHANY offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in ALLEGHANY?

FEMA's National Risk Index rates ALLEGHANY as "Relatively Moderate" (score 30).

What are industrial electricity rates in ALLEGHANY?

Average industrial electricity is 4.19¢/kWh and commercial is 4.81¢/kWh in ALLEGHANY.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in ALLEGHANY, Virginia”, https://gridcensus.com/datacenter-sites/virginia/alleghany (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for ALLEGHANY, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.