Datacenter Sites in Alexandria city, Virginia

Alexandria city has 30 scored datacenter candidate sites averaging 58.3/100 DC Readiness, with a catalogued aggregate of 3,150 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Alexandria city, Virginia has 30 scored datacenter candidate sites averaging 58.3/100 DC Readiness, about 12% above the Virginia average of 52.2. It ranks 58th of 122 Virginia counties by number of sites and 7th by average score. The top-scoring site is Substation-Adjacent site · 804783a1 at 65.1/100.

30
Candidate sites
58.3/100
Avg DC Readiness
3,150 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Alexandria city

Site-selection context for Alexandria city

Yessales_tax_exemption
Datacenter tax incentive
4.81¢/kWh
Commercial electricity
4.19¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$5,900
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Alexandria city compare with other counties in Virginia?

By number of scored sites, Alexandria city ranks 58th of the 122 Virginia counties with a county page, holding 0.5% of the state's 5,871 sites. Its average DC Readiness of 58.3/100 ranks 7th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1271st-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 14 score 55 or higher.

What types of datacenter sites are in Alexandria city?

Shovel-Ready sites are the most common (16, 53% of the county's inventory), followed by substation-adjacent (13) and greenfield (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Alexandria city?

Industrial electricity averages 4.19¢/kWh and commercial 4.81¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 7 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $5,900 an acre.

By site type

Top datacenter sites in Alexandria city

Top datacenter sites in Alexandria city
SiteTypeVoltageCapacityQueue waitScore
TAP139314Substation-Adjacent230 kV300 MW5.1 yrs65.1
POTOMAC YARDSubstation-Adjacent230 kV300 MW5.1 yrs65.0
NORTH ALEXANDRIASubstation-Adjacent230 kV300 MW5.1 yrs64.9
ARLINGTONSubstation-Adjacent230 kV300 MW5.1 yrs64.8
VAN DOMSubstation-Adjacent230 kV300 MW5.1 yrs64.6
JEFFERSON STREETSubstation-Adjacent230 kV300 MW5.1 yrs64.6
VIRIGINIA HILLSSubstation-Adjacent230 kV300 MW5.1 yrs64.5
BLUE PLAINSSubstation-Adjacent230 kV300 MW4.7 yrs64.2
BELVOIRSubstation-Adjacent230 kV300 MW5.1 yrs64.0
GUM SPRINGSSubstation-Adjacent230 kV300 MW5.1 yrs64.0
OZ AlexandriaGreenfield——5.1 yrs62.1
FARMINGTONSubstation-Adjacent69 kV50 MW5.3 yrs56.5
GALLAHAN ROADSubstation-Adjacent69 kV50 MW5.3 yrs56.5
TAP139326Substation-Adjacent69 kV50 MW5.3 yrs56.4
3451 Exchange Ave - North & South TowerShovel-Ready——5.1 yrs54.6
1330 Braddock Pl - Braddock Metro Center IIIShovel-Ready——5.1 yrs54.5
TransPotomac Plaza-1199 N Fairfax StShovel-Ready——5.1 yrs54.5
Canal Center - Canal Center 4Shovel-Ready——5.1 yrs54.5
211 N Union St - Harbor Center Office BuildingShovel-Ready——5.1 yrs54.4
1737 King St - King Street Metroplace Ph 1Shovel-Ready——5.1 yrs54.4
Carlyle Tower 1Shovel-Ready——5.1 yrs54.4
1940 Duke St - Crescent at CarlyleShovel-Ready——5.1 yrs54.4
277 S Washington St - Atrium BldgShovel-Ready——5.1 yrs54.4
Bogle Business CenterShovel-Ready——5.1 yrs54.4
625 N Washington St - Washington SquareShovel-Ready——5.1 yrs54.4

Every scored site in Alexandria city

All 30 sites, best first.

Alexandria city datacenter FAQ

How many datacenter sites are in Alexandria city?

30 scored datacenter candidate sites, averaging 58.3/100 DC Readiness. That is the 58th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Alexandria city?

Substation-Adjacent site · 804783a1 scores 65.1/100 DC Readiness, the highest of the 30 scored sites in Alexandria city (a substation-adjacent site).

Does Alexandria city offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Alexandria city?

FEMA's National Risk Index rates Alexandria city as "Relatively Moderate" (score 30).

What are industrial electricity rates in Alexandria city?

Average industrial electricity is 4.19¢/kWh and commercial is 4.81¢/kWh in Alexandria city.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Alexandria city, Virginia”, https://gridcensus.com/datacenter-sites/virginia/alexandria-city (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Alexandria city, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.