Skip to content
Gridcensus

Datacenter Sites in Albemarle, Virginia

Albemarle has 18 scored datacenter candidate sites averaging 50.8/100 DC Readiness, with a catalogued aggregate of 600 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Albemarle, Virginia has 18 scored datacenter candidate sites averaging 50.8/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 82nd of 122 Virginia counties by number of sites and 93rd by average score. The top-scoring site is Substation-Adjacent site · db24419b at 60.4/100.

18
Candidate sites
50.8/100
Avg DC Readiness
600 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 18 in Albemarle

Site-selection context for Albemarle

Yessales_tax_exemption
Datacenter tax incentive
8.09¢/kWh
Commercial electricity
6.03¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$9,048
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Albemarle compare with other counties in Virginia?

By number of scored sites, Albemarle ranks 82nd of the 122 Virginia counties with a county page, holding 0.3% of the state's 5,871 sites. Its average DC Readiness of 50.8/100 ranks 93rd in the state and is roughly in line with the national average of 53.0. Nationally it has the 1835th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 4 score 55 or higher.

What types of datacenter sites are in Albemarle?

Shovel-Ready sites are the most common (12, 67% of the county's inventory), followed by substation-adjacent (4) and former mine (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Albemarle?

Industrial electricity averages 6.03¢/kWh and commercial 8.09¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 7 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $9,048 an acre.

By site type

Top datacenter sites in Albemarle

Top datacenter sites in Albemarle
SiteTypeVoltageCapacityQueue waitScore
TAP140470Substation-Adjacent230 kV300 MW5.1 yrs60.4
SHERWOODSubstation-Adjacent115 kV100 MW5.1 yrs55.2
RED HILLSubstation-Adjacent115 kV100 MW5.1 yrs55.2
TAP140468Substation-Adjacent115 kV100 MW5.1 yrs55.0
5400 Three Notch'd RoadShovel-Ready——5.1 yrs50.1
North Fork, A UVA Discovery ParkShovel-Ready——5.1 yrs49.6
Rivanna FuturesShovel-Ready——5.1 yrs49.4
Peter Jefferson Place VIShovel-Ready——5.1 yrs49.3
North Side Drive IndustrialShovel-Ready——5.1 yrs49.2
Biotech ManufacturingShovel-Ready——5.1 yrs49.2
Mine SiteFormer Mine——5.1 yrs49.2
Town Center ThreeShovel-Ready——5.1 yrs49.1
North Fork - Ready Site 8Shovel-Ready——5.1 yrs49.0
Corner of State Farm Blvd. and PJPShovel-Ready——5.1 yrs48.9
Sieg PropertyShovel-Ready——5.1 yrs48.8
Crossroads Shopping CenterShovel-Ready——5.1 yrs48.8
Westfield Road LotShovel-Ready——5.1 yrs48.8
Mine SiteFormer Mine——5.1 yrs48.8

Every scored site in Albemarle

All 18 sites, best first.

Albemarle datacenter FAQ

How many datacenter sites are in Albemarle?

18 scored datacenter candidate sites, averaging 50.8/100 DC Readiness. That is the 82nd-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Albemarle?

Substation-Adjacent site · db24419b scores 60.4/100 DC Readiness, the highest of the 18 scored sites in Albemarle (a substation-adjacent site).

Does Albemarle offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Albemarle?

FEMA's National Risk Index rates Albemarle as "Relatively Moderate" (score 30).

What are industrial electricity rates in Albemarle?

Average industrial electricity is 6.03¢/kWh and commercial is 8.09¢/kWh in Albemarle.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Albemarle, Virginia”, https://gridcensus.com/datacenter-sites/virginia/albemarle (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Albemarle, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.