Datacenter Sites in Orange County, Texas
Orange County has 92 scored datacenter candidate sites averaging 51.7/100 DC Readiness, with a catalogued aggregate of 9,100 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.
At a glance
Orange County, Texas has 92 scored datacenter candidate sites averaging 51.7/100 DC Readiness, roughly in line with the Texas average of 56.4. It ranks 8th of 234 Texas counties by number of sites and 214th by average score. The top-scoring site is HARTBURG at 60.7/100.
Site-selection context for Orange County
Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.
How does Orange County compare with other counties in Texas?
By number of scored sites, Orange County ranks 8th of the 234 Texas counties with a county page, holding 1.3% of the state's 6,839 sites. Its average DC Readiness of 51.7/100 ranks 214th in the state and is roughly in line with the national average of 53.0. Nationally it has the 364th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 13 score 55 or higher.
What types of datacenter sites are in Orange County?
Substation-Adjacent sites are the most common (67, 73% of the county's inventory), followed by greenfield (21) and former mine (4). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Orange County?
Industrial electricity averages 5.87¢/kWh and commercial 9.60¢/kWh. FEMA's National Risk Index rates the county "Very High" (55). WRI water stress is medium-high. 3 fiber providers report service in the county. The climate runs 2,600 cooling degree days a year with a mean temperature of 65°F. Land is valued around $3,994 an acre.
By site type
Top datacenter sites in Orange County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| HARTBURG | Substation-Adjacent | 500 kV | 1,000 MW | 3.5 yrs | 60.7 |
| UNKNOWN308840 | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 58.2 |
| UNKNOWN304498 | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 57.2 |
| UNKNOWN301088 | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 56.3 |
| UNKNOWN304113 | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 56.3 |
| VFW PARK | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 56.3 |
| UNKNOWN300914 | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 56.3 |
| GULFWAY | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 56.3 |
| HELBIG | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 56.2 |
| UNKNOWN307198 | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 56.2 |
| TAP305334 | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 56.1 |
| UNKNOWN306832 | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 56.1 |
| EC Near Sabine | Greenfield | — | — | 3.5 yrs | 55.2 |
| EC Near Sabine | Greenfield | — | — | 3.5 yrs | 54.9 |
| EC Near Sabine River Operations | Greenfield | — | — | 3.5 yrs | 54.8 |
| EC Near Sabine River Operations | Greenfield | — | — | 3.5 yrs | 54.6 |
| EC Near Sabine | Greenfield | — | — | 3.5 yrs | 53.9 |
| EC Near Engineered Carbons Echo Cogeneration | Greenfield | — | — | 3.5 yrs | 53.6 |
| OZ Orange | Greenfield | — | — | 3.5 yrs | 53.3 |
| EC Near Engineered Carbons Echo Cogeneration | Greenfield | — | — | 3.5 yrs | 53.1 |
| UNKNOWN307231 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 52.3 |
| TAP310866 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 52.3 |
| UNKNOWN303037 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 52.3 |
| UNKNOWN304495 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 52.3 |
| TAP308125 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 52.3 |
Every scored site in Orange County
All 92 sites, best first.
- HARTBURG · 60.7
- Substation-Adjacent site · 57044f0a · 58.2
- Substation-Adjacent site · d5945866 · 57.2
- Substation-Adjacent site · 598c854a · 56.3
- Substation-Adjacent site · 380df304 · 56.3
- GULFWAY · 56.3
- VFW PARK · 56.3
- Substation-Adjacent site · 9160ca45 · 56.3
- HELBIG · 56.2
- Substation-Adjacent site · 6294577e · 56.2
- Substation-Adjacent site · fd82c2b9 · 56.1
- Substation-Adjacent site · bd2e036c · 56.1
- EC Near Sabine · 8bc763a4 · 55.2
- EC Near Sabine · 6a65fe87 · 54.9
- EC Near Sabine River Operations · 3742bff7 · 54.8
- EC Near Sabine River Operations · 6bd8de0a · 54.6
- EC Near Sabine · 65fd926a · 53.9
- EC Near Engineered Carbons Echo Cogeneration · 03884752 · 53.6
- OZ Orange · 53.3
- EC Near Engineered Carbons Echo Cogeneration · 4c640657 · 53.1
- EVADALE · 52.3
- Substation-Adjacent site · a89fa9da · 52.3
- Substation-Adjacent site · b61b65af · 52.3
- Substation-Adjacent site · 54315e39 · 52.3
- Substation-Adjacent site · dac4a837 · 52.3
- Substation-Adjacent site · 5e2a48e1 · 52.3
- SOUTH BEAUMONT · 52.3
- Substation-Adjacent site · ae5e137c · 52.3
- Substation-Adjacent site · a2db7e8d · 52.3
- Substation-Adjacent site · b5e6eba0 · 52.3
- ORANGE BULK · 52.3
- Substation-Adjacent site · 0d056dca · 52.3
- Substation-Adjacent site · 04fbc760 · 52.3
- Substation-Adjacent site · 15c4fb23 · 52.3
- Substation-Adjacent site · 2b68e3d1 · 52.3
- Substation-Adjacent site · 84e0e4f3 · 52.3
- Substation-Adjacent site · d2a7d25c · 52.3
- PORT NECHES · 52.3
- ARCHIE · 52.3
- Substation-Adjacent site · 66144062 · 52.3
- COW · 52.3
- Substation-Adjacent site · d1c98426 · 52.3
- Substation-Adjacent site · 26989bac · 52.2
- Substation-Adjacent site · bcf08a28 · 52.2
- Substation-Adjacent site · f30305c3 · 52.1
- Substation-Adjacent site · 086ebb30 · 52.1
- Substation-Adjacent site · daade6aa · 52.1
- Substation-Adjacent site · bdc4a1ff · 51.9
- BURT STREET 138KV · 51.8
- Substation-Adjacent site · 8634a7c1 · 51.8
- Substation-Adjacent site · a229b216 · 51.8
- EC Near Engineered Carbons Echo Cogeneration · 8fcf58a4 · 51.8
- EC Near Sabine River Operations · 51b0fc75 · 51.5
- Substation-Adjacent site · 07906d89 · 51.2
- Substation-Adjacent site · fbaffd4b · 50.8
- Substation-Adjacent site · ba2d7cdc · 50.0
- CARGILL WIRE · 50.0
- Substation-Adjacent site · 371ff776 · 49.9
- Substation-Adjacent site · 0837d15f · 49.9
- Substation-Adjacent site · 8631a70a · 49.9
- Substation-Adjacent site · a4b3ebc0 · 49.9
- Substation-Adjacent site · 8aa4a044 · 49.9
- Substation-Adjacent site · 9a4d9df8 · 49.9
- Substation-Adjacent site · d6a64a2b · 49.9
- WEST ORANGE · 49.9
- Substation-Adjacent site · 8390fcfd · 49.9
- CORDREY · 49.9
- Substation-Adjacent site · 158f89bf · 49.9
- Substation-Adjacent site · a60c8cf2 · 49.9
- BRIARCLIFF · 49.9
- Substation-Adjacent site · 799cd053 · 49.9
- Substation-Adjacent site · 655acf6a · 49.8
- Substation-Adjacent site · 31bf90d0 · 49.8
- Substation-Adjacent site · d1c86279 · 49.8
- Substation-Adjacent site · 6178e563 · 49.8
- EC Near Engineered Carbons Echo Cogeneration · 947808f6 · 49.5
- EC Near Sabine River Operations · 2b183dbe · 49.3
- Substation-Adjacent site · 707f39b4 · 49.3
- EC Near Sabine River Operations · e87a6ce3 · 49.2
- EC Near Sabine River Operations · aa81f02a · 49.1
- EC Near Engineered Carbons Echo Cogeneration · a2472ef8 · 49.1
- FRONT STREET · 49.1
- EC Near Sabine River Operations · 8a092d65 · 49.0
- EC Near Sabine · cee263ec · 48.8
- EC Near Engineered Carbons Echo Cogeneration · b438dd6a · 48.6
- EC Near Sabine · ede033b8 · 48.6
- EC Near Sabine River Operations · c079a5e7 · 47.1
- Mine Site · b9811775 · 45.9
- Mine Site · 4c96652a · 45.9
- Mine Site · 2d8e4f8a · 45.9
- Greenfield (UNKNOWN300871 - ORANGE BULK) · 45.8
- Mine Site · c91ff243 · 45.7
Orange County datacenter FAQ
How many datacenter sites are in Orange County?
92 scored datacenter candidate sites, averaging 51.7/100 DC Readiness. That is the 8th-most of 234 Texas counties with five or more sites.
What is the highest-scoring datacenter site in Orange County?
HARTBURG scores 60.7/100 DC Readiness, the highest of the 92 scored sites in Orange County (a substation-adjacent site).
Does Orange County offer datacenter tax incentives?
Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.
What is the natural-hazard risk in Orange County?
FEMA's National Risk Index rates Orange County as "Very High" (score 55).
What are industrial electricity rates in Orange County?
Average industrial electricity is 5.87¢/kWh and commercial is 9.60¢/kWh in Orange County.
More in Texas
- All datacenter sites in Texas· 6,839 sites
- Operating datacenters in Texas
- Electric substations in Texas
- Harris County· 348 sites · avg 57.3
- Dallas County· 308 sites · avg 61.3
- Tarrant County· 289 sites · avg 59.4
- Travis County· 203 sites · avg 59.8
- El Paso County· 172 sites · avg 54.5
- Bexar County· 166 sites · avg 61.7
- Substation-Adjacent sites in Texas
- Greenfield sites in Texas
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Orange County, Texas”, https://gridcensus.com/datacenter-sites/texas/orange-county (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Orange County, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.