Datacenter Sites in Dare, North Carolina

Dare has 21 scored datacenter candidate sites averaging 48.8/100 DC Readiness, with a catalogued aggregate of 3,000 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Dare, North Carolina has 21 scored datacenter candidate sites averaging 48.8/100 DC Readiness, about 11% below the North Carolina average of 55.1. It ranks 38th of 88 North Carolina counties by number of sites and 86th by average score. The top-scoring site is Substation-Adjacent site · f03bec70 at 54.0/100.

21
Candidate sites
48.8/100
Avg DC Readiness
3,000 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 21 in Dare

Site-selection context for Dare

Yessales_tax_exemption
Datacenter tax incentive
12.01¢/kWh
Commercial electricity
8.40¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$13,921
Land price / acre
1,600
Cooling degree days
3,300
Heating degree days
59°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

How does Dare compare with other counties in North Carolina?

By number of scored sites, Dare ranks 38th of the 88 North Carolina counties with a county page, holding 0.8% of the state's 2,778 sites. Its average DC Readiness of 48.8/100 ranks 86th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1665th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 0 score 55 or higher.

What types of datacenter sites are in Dare?

Greenfield sites are the most common (12, 57% of the county's inventory), followed by substation-adjacent (9). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Dare?

Industrial electricity averages 8.40¢/kWh and commercial 12.01¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (42). WRI water stress is low. 4 fiber providers report service in the county. The climate runs 1,600 cooling degree days a year with a mean temperature of 59°F. Land is valued around $13,921 an acre.

By site type

Top datacenter sites in Dare

Top datacenter sites in Dare
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN146982Substation-Adjacent230 kV300 MW5.3 yrs54.0
TAP169671Substation-Adjacent230 kV300 MW5.3 yrs54.0
UNKNOWN111634Substation-Adjacent230 kV300 MW5.3 yrs53.2
UNKNOWN111305Substation-Adjacent230 kV300 MW5.3 yrs53.2
TAP146156Substation-Adjacent230 kV300 MW5.3 yrs53.2
TAP146950Substation-Adjacent230 kV300 MW5.3 yrs53.2
UNKNOWN111304Substation-Adjacent230 kV300 MW5.3 yrs53.2
UNKNOWN111631Substation-Adjacent230 kV300 MW5.3 yrs53.2
UNKNOWN111630Substation-Adjacent230 kV300 MW5.3 yrs53.2
EC Near Kitty HawkGreenfield——5.3 yrs49.6
EC Near Kitty HawkGreenfield——5.3 yrs49.4
Greenfield (UNKNOWN111304 - UNKNOWN111305)Greenfield230 kV300 MW5.3 yrs46.9
EC Near Kitty HawkGreenfield——5.3 yrs45.5
EC Near Kitty HawkGreenfield——5.3 yrs45.0
EC Near Kitty HawkGreenfield——5.3 yrs44.8
EC Near Kitty HawkGreenfield——5.3 yrs44.8
EC Near Kitty HawkGreenfield——5.3 yrs44.5
EC Near Kitty HawkGreenfield——5.3 yrs44.2
EC Near Kitty HawkGreenfield——5.3 yrs44.1
EC Near Kitty HawkGreenfield——5.3 yrs43.3
OZ DareGreenfield——5.3 yrs43.1

Every scored site in Dare

All 21 sites, best first.

Dare datacenter FAQ

How many datacenter sites are in Dare?

21 scored datacenter candidate sites, averaging 48.8/100 DC Readiness. That is the 38th-most of 88 North Carolina counties with five or more sites.

What is the highest-scoring datacenter site in Dare?

Substation-Adjacent site · f03bec70 scores 54.0/100 DC Readiness, the highest of the 21 scored sites in Dare (a substation-adjacent site).

Does Dare offer datacenter tax incentives?

Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

What is the natural-hazard risk in Dare?

FEMA's National Risk Index rates Dare as "Relatively High" (score 42).

What are industrial electricity rates in Dare?

Average industrial electricity is 8.40¢/kWh and commercial is 12.01¢/kWh in Dare.

More in North Carolina

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Dare, North Carolina”, https://gridcensus.com/datacenter-sites/north-carolina/dare (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Dare, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.