OZ Dare

Greenfield

Dare, North Carolina · PJM

DC Readiness
43.0
Fair / 100

OZ Dare is a greenfield datacenter candidate site in Dare, North Carolina, interconnecting through PJM. It screens at 43.0/100 DC Readiness and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth177
Avg queue wait4.3 yrs
Recent queue wait4.3 yrs
Completion rate14%
Withdrawal rate86%

Connectivity

Nearest IXPGlobalinx Virginia Beach CLS
IXP distance68.4 mi
Fiber providers4
Fiber coverage55.5%
Nearest cloud providerAzure
Nearest cloud regioneastus2
Cloud region distance153.0 mi

Site characteristics

Site typeGreenfield
Parcel ownerUnited States
Parcel APN970500678472
Land owner typeprivate
Buildability0.0/100
Land cover (NLCD)Woody Wetlands

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)0.80
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score33/100
Construction cost index71.0 (avg 100)

Location context

Nearest datacenterGlobalinx Virginia Beach CLS
DC distance68.4 mi
Nearest rail2.1 mi
Nearest gas pipeline63.5 mi
Nearest fiber route109.6 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.01¢/kWh
Industrial electricity8.40¢/kWh
Cooling degree days1,600
Heating degree days3,300
Land price / acre$13,921

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
35
Fiber connectivity12%
35
Energy cost10%
82
Water risk8%
89
Natural hazard8%
33
Buildability7%
0
Labor market4%
50
DC cluster4%
25
Land / acreage3%
32
Construction cost3%
91
Gas pipeline2%
0
Tax incentive2%
100
Climate / cooling2%
45

Nearby comparable sites

Other scored datacenter candidate sites in Dare, ranked by DC Readiness.

Sites near OZ Dare
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN111631Substation-Adjacent230 kV300 MW4.3 yrs60.7
TAP146156Substation-Adjacent230 kV300 MW4.3 yrs60.1
TAP148453Substation-Adjacent230 kV300 MW4.3 yrs59.1
TAP148454Substation-Adjacent230 kV300 MW4.3 yrs58.6
UNKNOWN111305Substation-Adjacent230 kV300 MW4.3 yrs54.7
Greenfield (UNKNOWN111304 - TAP146156)Greenfield230 kV300 MW4.3 yrs53.3
EC Near Kitty HawkGreenfield4.3 yrs49.9
EC Near Kitty HawkGreenfield4.3 yrs49.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Dare, Dare. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.