Datacenter Sites in Wayne, New York

Wayne has 23 scored datacenter candidate sites averaging 51.2/100 DC Readiness, with a catalogued aggregate of 500 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Wayne, New York has 23 scored datacenter candidate sites averaging 51.2/100 DC Readiness, roughly in line with the New York average of 54.0. It ranks 46th of 61 New York counties by number of sites and 49th by average score. The top-scoring site is Substation-Adjacent site · 2da6a96d at 57.2/100.

23
Candidate sites
51.2/100
Avg DC Readiness
500 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 23 in Wayne

Site-selection context for Wayne

Yessales_tax_exemption
Datacenter tax incentive
10.43¢/kWh
Commercial electricity
8.27¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$4,862
Land price / acre
700
Cooling degree days
6,100
Heating degree days
46°F
Mean annual temp

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

How does Wayne compare with other counties in New York?

By number of scored sites, Wayne ranks 46th of the 61 New York counties with a county page, holding 0.8% of the state's 2,980 sites. Its average DC Readiness of 51.2/100 ranks 49th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1558th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 6 score 55 or higher.

What types of datacenter sites are in Wayne?

Industrial sites are the most common (9, 39% of the county's inventory), followed by former mine (7) and substation-adjacent (5). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Wayne?

Industrial electricity averages 8.27¢/kWh and commercial 10.43¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (35). WRI water stress is low. 7 fiber providers report service in the county. The climate runs 700 cooling degree days a year with a mean temperature of 46°F. Land is valued around $4,862 an acre.

By site type

Top datacenter sites in Wayne

Top datacenter sites in Wayne
SiteTypeVoltageCapacityQueue waitScore
TAP138449Substation-Adjacent115 kV100 MW4.3 yrs57.2
STATION #230Substation-Adjacent115 kV100 MW4.3 yrs57.2
OZ WayneGreenfield——4.3 yrs56.7
UNKNOWN124705Substation-Adjacent115 kV100 MW4.3 yrs55.9
SLEIGHT RDSubstation-Adjacent115 kV100 MW4.3 yrs55.8
UNKNOWN145100Substation-Adjacent115 kV100 MW4.3 yrs55.5
1071 NYS Route 31Industrial——4.3 yrs51.9
1936 NYS Route 31Industrial——4.3 yrs51.7
Mine SiteFormer Mine——4.3 yrs50.1
D & L DisposalIndustrial——4.3 yrs50.0
1303 N Main StreetIndustrial——4.3 yrs50.0
Mine SiteFormer Mine——4.3 yrs49.9
Caulkins Tire ServiceIndustrial——4.3 yrs49.9
42 Elmer StreetIndustrial——4.3 yrs49.5
Mine SiteFormer Mine——4.3 yrs49.4
North Rose Rail StationIndustrial——4.3 yrs48.9
OZ WayneGreenfield——4.3 yrs48.9
Mine SiteFormer Mine——4.3 yrs48.8
Mine SiteFormer Mine——4.3 yrs48.4
Ridge Road LandfillIndustrial——4.3 yrs48.0
Limekiln JunkyardIndustrial——4.3 yrs48.0
Mine SiteFormer Mine——4.3 yrs47.9
Mine SiteFormer Mine——4.3 yrs47.8

Every scored site in Wayne

All 23 sites, best first.

Wayne datacenter FAQ

How many datacenter sites are in Wayne?

23 scored datacenter candidate sites, averaging 51.2/100 DC Readiness. That is the 46th-most of 61 New York counties with five or more sites.

What is the highest-scoring datacenter site in Wayne?

Substation-Adjacent site · 2da6a96d scores 57.2/100 DC Readiness, the highest of the 23 scored sites in Wayne (a substation-adjacent site).

Does Wayne offer datacenter tax incentives?

Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

What is the natural-hazard risk in Wayne?

FEMA's National Risk Index rates Wayne as "Relatively High" (score 35).

What are industrial electricity rates in Wayne?

Average industrial electricity is 8.27¢/kWh and commercial is 10.43¢/kWh in Wayne.

More in New York

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Wayne, New York”, https://gridcensus.com/datacenter-sites/new-york/wayne (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Wayne, New York is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.