Wayne has 32 scored datacenter candidate sites averaging 54.3/100 DC Readiness, with a catalogued aggregate of 2,900 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

32
Candidate sites
54.3/100
Avg DC Readiness
2,900 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 23 in Wayne

Site-selection context for Wayne

Yessales_tax_exemption
Datacenter tax incentive
10.43¢/kWh
Commercial electricity
8.27¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$4,862
Land price / acre
700
Cooling degree days
6,100
Heating degree days
46°F
Mean annual temp

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

By site type

Top datacenter sites in Wayne

Top datacenter sites in Wayne
SiteTypeVoltageCapacityQueue waitScore
OZ WayneGreenfield3.5 yrs57.8
STATION #230Substation-Adjacent115 kV100 MW4.9 yrs57.3
TAP138449Substation-Adjacent115 kV100 MW4.9 yrs56.5
UNKNOWN124705Substation-Adjacent115 kV100 MW4.9 yrs55.1
SLEIGHT RDSubstation-Adjacent115 kV100 MW4.9 yrs54.5
1071 NYS Route 31Industrial4.9 yrs53.8
UNKNOWN145100Substation-Adjacent115 kV100 MW4.9 yrs53.7
1936 NYS Route 31Industrial4.9 yrs53.6
Mine SiteFormer Mine4.9 yrs52.0
Mine SiteFormer Mine4.9 yrs51.9
D & L DisposalIndustrial4.9 yrs51.9
1303 N Main StreetIndustrial4.9 yrs51.9
Caulkins Tire ServiceIndustrial4.9 yrs51.8
42 Elmer StreetIndustrial4.9 yrs51.5
Mine SiteFormer Mine4.9 yrs51.3
North Rose Rail StationIndustrial4.9 yrs50.8
Mine SiteFormer Mine4.9 yrs50.7
Mine SiteFormer Mine4.9 yrs50.3
Ridge Road LandfillIndustrial4.9 yrs50.0
Limekiln JunkyardIndustrial4.9 yrs49.9
OZ WayneGreenfield3.5 yrs49.9
Mine SiteFormer Mine4.9 yrs49.8
Mine SiteFormer Mine4.9 yrs49.7

Wayne datacenter FAQ

How many datacenter sites are in Wayne?
32 scored datacenter candidate sites, averaging 54.3/100 DC Readiness.
Does Wayne offer datacenter tax incentives?
Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.
What is the natural-hazard risk in Wayne?
FEMA's National Risk Index rates Wayne as "Relatively High" (score 35).
What are industrial electricity rates in Wayne?
Average industrial electricity is 8.27¢/kWh and commercial is 10.43¢/kWh in Wayne.

Dataset updated . Screening estimates derived from public data sources.