1303 N Main Street is an industrial datacenter candidate site in Wayne, New York, interconnecting through NYISO. It screens at 51.9/100 DC Readiness and a 4.9 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Wayne, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Wayne | Greenfield | — | — | 3.5 yrs | 57.8 |
| STATION #230 | Substation-Adjacent | 115 kV | 100 MW | 4.9 yrs | 57.3 |
| TAP138449 | Substation-Adjacent | 115 kV | 100 MW | 4.9 yrs | 56.5 |
| UNKNOWN124705 | Substation-Adjacent | 115 kV | 100 MW | 4.9 yrs | 55.1 |
| SLEIGHT RD | Substation-Adjacent | 115 kV | 100 MW | 4.9 yrs | 54.5 |
| 1071 NYS Route 31 | Industrial | — | — | 4.9 yrs | 53.8 |
| UNKNOWN145100 | Substation-Adjacent | 115 kV | 100 MW | 4.9 yrs | 53.7 |
| 1936 NYS Route 31 | Industrial | — | — | 4.9 yrs | 53.6 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for 1303 N Main Street, Wayne. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.