Skip to content
Gridcensus

Wayne, New York · NYISO

DC Readiness
55.5
Good / 100

SLEIGHT RD is a substation-adjacent datacenter candidate site in Wayne, New York, interconnecting through NYISO. It screens at 55.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 4.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSLEIGHT RD
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityNEW YORK STATE ELEC & GAS CORPinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionNYISO
Queue depth95
Avg queue wait4.9 yrs

Connectivity

Nearest IXPRochester Colo
IXP distance19.9 mi
Fiber providers7
Fiber coverage25.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterRochester Colo
DC distance19.9 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.43¢/kWh
Industrial electricity8.27¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$4,862

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track SLEIGHT RD

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
38
Fiber connectivity12%
66
Energy cost10%
50
Water risk7%
90
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Wayne, ranked by DC Readiness.

Sites near SLEIGHT RD
SiteTypeVoltageCapacityQueue waitScore
STATION #230Substation-Adjacent115 kV100 MW4.9 yrs56.9
TAP138449Substation-Adjacent115 kV100 MW4.9 yrs56.9
OZ WayneGreenfield——3.5 yrs56.7
UNKNOWN124705Substation-Adjacent115 kV100 MW4.9 yrs55.6
UNKNOWN145100Substation-Adjacent115 kV100 MW4.9 yrs55.2
1071 NYS Route 31Industrial——4.9 yrs51.6
1936 NYS Route 31Industrial——4.9 yrs51.4
Mine SiteFormer Mine——4.9 yrs49.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SLEIGHT RD, Wayne. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.