Datacenter Sites in Humboldt, Nevada

Humboldt has 51 scored datacenter candidate sites averaging 48.8/100 DC Readiness, with a catalogued aggregate of 1,715 MW. FEMA rates local natural-hazard risk as "Very Low". The county has a datacenter tax incentive on record.

At a glance

Humboldt, Nevada has 51 scored datacenter candidate sites averaging 48.8/100 DC Readiness, roughly in line with the Nevada average of 48.5. It ranks 11th of 17 Nevada counties by number of sites and 6th by average score. The top-scoring site is VALMY at 57.6/100.

51
Candidate sites
48.8/100
Avg DC Readiness
1,715 MW
Catalogued capacity
theoretical aggregate
Very Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Humboldt

Site-selection context for Humboldt

Yessales_tax_abatement
Datacenter tax incentive
7.18¢/kWh
Commercial electricity
10.22¢/kWh
Industrial electricity
2
Fiber providers
Extremely High
Water stress
$1,164
Land price / acre
2,000
Cooling degree days
3,700
Heating degree days
50°F
Mean annual temp

Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

How does Humboldt compare with other counties in Nevada?

By number of scored sites, Humboldt ranks 11th of the 17 Nevada counties with a county page, holding 2.8% of the state's 1,809 sites. Its average DC Readiness of 48.8/100 ranks 6th in the state and is roughly in line with the national average of 53.0. Nationally it has the 740th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 6 score 55 or higher.

What types of datacenter sites are in Humboldt?

Former Mine sites are the most common (23, 45% of the county's inventory), followed by greenfield (13) and substation-adjacent (12). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Humboldt?

Industrial electricity averages 10.22¢/kWh and commercial 7.18¢/kWh. FEMA's National Risk Index rates the county "Very Low" (12). WRI water stress is extremely high. 2 fiber providers report service in the county. The climate runs 2,000 cooling degree days a year with a mean temperature of 50°F. Land is valued around $1,164 an acre.

By site type

Top datacenter sites in Humboldt

Top datacenter sites in Humboldt
SiteTypeVoltageCapacityQueue waitScore
VALMYSubstation-Adjacent345 kV600 MW3.5 yrs57.6
WinnemuccaBrownfield120 kV15 MW3.5 yrs57.3
EC Near WinnemuccaGreenfield——3.5 yrs55.3
EC Near WinnemuccaGreenfield——3.5 yrs55.2
EC Near WinnemuccaGreenfield——3.5 yrs55.2
EC Near WinnemuccaGreenfield——3.5 yrs55.0
EC FFE Humboldt CountyGreenfield——3.5 yrs54.3
EC Near WinnemuccaGreenfield——3.5 yrs54.1
EC Near WinnemuccaGreenfield——3.5 yrs53.7
EC Near WinnemuccaGreenfield——3.5 yrs53.6
EC Near WinnemuccaGreenfield——3.5 yrs53.4
OROVADASubstation-Adjacent120 kV100 MW3.5 yrs51.7
KINGS RIVERSubstation-Adjacent115 kV100 MW3.5 yrs51.6
EC Near WinnemuccaGreenfield——3.5 yrs51.5
DAVEY TOWNSubstation-Adjacent120 kV100 MW3.5 yrs51.3
WINNEMUCCASubstation-Adjacent120 kV100 MW3.5 yrs51.3
LONE TREESubstation-Adjacent120 kV100 MW3.5 yrs51.2
BLUE MOUNTAINSubstation-Adjacent120 kV100 MW3.5 yrs51.1
UNKNOWN304552Substation-Adjacent115 kV100 MW3.5 yrs51.0
UNKNOWN202789Substation-Adjacent115 kV100 MW3.5 yrs51.0
UNKNOWN202787Substation-Adjacent115 kV100 MW3.5 yrs50.3
GETCHELSubstation-Adjacent120 kV100 MW3.5 yrs50.0
RABBIT CREEKSubstation-Adjacent120 kV100 MW3.5 yrs50.0
EC Near WinnemuccaGreenfield——3.5 yrs49.9
EC Near WinnemuccaGreenfield——3.5 yrs49.6

Every scored site in Humboldt

All 51 sites, best first.

Humboldt datacenter FAQ

How many datacenter sites are in Humboldt?

51 scored datacenter candidate sites, averaging 48.8/100 DC Readiness. That is the 11th-most of 17 Nevada counties with five or more sites.

What is the highest-scoring datacenter site in Humboldt?

VALMY scores 57.6/100 DC Readiness, the highest of the 51 scored sites in Humboldt (a substation-adjacent site).

Does Humboldt offer datacenter tax incentives?

Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

What is the natural-hazard risk in Humboldt?

FEMA's National Risk Index rates Humboldt as "Very Low" (score 12).

What are industrial electricity rates in Humboldt?

Average industrial electricity is 10.22¢/kWh and commercial is 7.18¢/kWh in Humboldt.

More in Nevada

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Humboldt, Nevada”, https://gridcensus.com/datacenter-sites/nevada/humboldt (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Humboldt, Nevada is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.