UNKNOWN202789
Substation-AdjacentHumboldt, Oregon · WECC
UNKNOWN202789 is a substation-adjacent datacenter candidate site in Humboldt, Oregon, interconnecting through WECC. It screens at 46.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Humboldt, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Winnemucca | Brownfield | 120 kV | 15 MW | 5.8 yrs | 56.5 |
| EC Near Winnemucca | Greenfield | — | — | 5.8 yrs | 53.5 |
| EC Near Winnemucca | Greenfield | — | — | 5.8 yrs | 53.4 |
| EC Near Winnemucca | Greenfield | — | — | 5.8 yrs | 53.3 |
| EC Near Winnemucca | Greenfield | — | — | 5.8 yrs | 53.1 |
| VALMY | Substation-Adjacent | 345 kV | 600 MW | 6.9 yrs | 52.7 |
| EC FFE Humboldt County | Greenfield | — | — | 5.8 yrs | 52.4 |
| EC Near Winnemucca | Greenfield | — | — | 5.8 yrs | 52.2 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for UNKNOWN202789, Humboldt. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.