Datacenter Sites in Hall, Nebraska

Hall has 32 scored datacenter candidate sites averaging 55.3/100 DC Readiness, with a catalogued aggregate of 1,200 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Hall, Nebraska has 32 scored datacenter candidate sites averaging 55.3/100 DC Readiness, roughly in line with the Nebraska average of 51.8. It ranks 21st of 79 Nebraska counties by number of sites and 13th by average score. The top-scoring site is EC Near C W Burdick · 062e1644 at 60.9/100.

32
Candidate sites
55.3/100
Avg DC Readiness
1,200 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Hall

Site-selection context for Hall

Yessales_tax_exemption
Datacenter tax incentive
7.23¢/kWh
Commercial electricity
8.00¢/kWh
Industrial electricity
12
Fiber providers
Medium-High
Water stress
$5,923
Land price / acre
1,000
Cooling degree days
6,200
Heating degree days
49°F
Mean annual temp

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

How does Hall compare with other counties in Nebraska?

By number of scored sites, Hall ranks 21st of the 79 Nebraska counties with a county page, holding 1.4% of the state's 2,329 sites. Its average DC Readiness of 55.3/100 ranks 13th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1196th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 21 score 55 or higher.

What types of datacenter sites are in Hall?

Substation-Adjacent sites are the most common (14, 44% of the county's inventory), followed by greenfield (8) and industrial (7). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Hall?

Industrial electricity averages 8.00¢/kWh and commercial 7.23¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (28). WRI water stress is medium-high. 12 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 49°F. Land is valued around $5,923 an acre.

By site type

Top datacenter sites in Hall

Top datacenter sites in Hall
SiteTypeVoltageCapacityQueue waitScore
EC Near C W BurdickGreenfield——4.3 yrs60.9
EC Near C W BurdickGreenfield——4.3 yrs59.3
EC Near C W BurdickGreenfield——4.3 yrs58.7
EC Near C W BurdickGreenfield——4.3 yrs58.4
EC Near C W BurdickGreenfield——4.3 yrs58.0
UNKNOWN131926Substation-Adjacent115 kV100 MW4.3 yrs57.6
EC Near C W BurdickGreenfield——4.3 yrs57.6
UNKNOWN131921Substation-Adjacent115 kV100 MW4.3 yrs57.0
UNKNOWN131925Substation-Adjacent115 kV100 MW4.3 yrs57.0
UNKNOWN131920Substation-Adjacent115 kV100 MW4.3 yrs57.0
UNKNOWN131923Substation-Adjacent115 kV100 MW4.3 yrs57.0
UNKNOWN131924Substation-Adjacent115 kV100 MW4.3 yrs57.0
UNKNOWN131927Substation-Adjacent115 kV100 MW4.3 yrs57.0
UNKNOWN131922Substation-Adjacent115 kV100 MW4.3 yrs56.9
UNKNOWN148616Substation-Adjacent115 kV100 MW4.3 yrs56.7
UNKNOWN168352Substation-Adjacent69 kV50 MW4.3 yrs56.5
UNKNOWN131725Substation-Adjacent115 kV100 MW4.3 yrs56.5
TAP168347Substation-Adjacent69 kV50 MW4.3 yrs55.8
UNKNOWN168348Substation-Adjacent69 kV50 MW4.3 yrs55.8
UNKNOWN168343Substation-Adjacent69 kV50 MW4.3 yrs55.5
EC Near C W BurdickGreenfield——4.3 yrs55.0
EC Near C W BurdickGreenfield——4.3 yrs54.9
Fairbanks Farm EquipmentIndustrial——4.3 yrs51.9
Frank Hochstetler PropertyIndustrial——4.3 yrs51.9
Wood River Industrial ParkIndustrial——4.3 yrs51.8

Every scored site in Hall

All 32 sites, best first.

Hall datacenter FAQ

How many datacenter sites are in Hall?

32 scored datacenter candidate sites, averaging 55.3/100 DC Readiness. That is the 21st-most of 79 Nebraska counties with five or more sites.

What is the highest-scoring datacenter site in Hall?

EC Near C W Burdick · 062e1644 scores 60.9/100 DC Readiness, the highest of the 32 scored sites in Hall (a greenfield site).

Does Hall offer datacenter tax incentives?

ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

What is the natural-hazard risk in Hall?

FEMA's National Risk Index rates Hall as "Relatively Moderate" (score 28).

What are industrial electricity rates in Hall?

Average industrial electricity is 8.00¢/kWh and commercial is 7.23¢/kWh in Hall.

More in Nebraska

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Hall, Nebraska”, https://gridcensus.com/datacenter-sites/nebraska/hall (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Hall, Nebraska is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.