Datacenter Sites in Furnas, Nebraska

Furnas has 123 scored datacenter candidate sites averaging 48.4/100 DC Readiness, with a catalogued aggregate of 101 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

123
Candidate sites
48.4/100
Avg DC Readiness
101 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Furnas

Site-selection context for Furnas

Yessales_tax_exemption
Datacenter tax incentive
Commercial electricity
Industrial electricity
4
Fiber providers
Medium-High
Water stress
$2,895
Land price / acre
1,000
Cooling degree days
6,200
Heating degree days
49°F
Mean annual temp

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

By site type

Top datacenter sites in Furnas

Top datacenter sites in Furnas
SiteTypeVoltageCapacityQueue waitScore
EC Near CambridgeGreenfield3.5 yrs59.9
EC Near CambridgeGreenfield3.5 yrs59.9
EC Near CambridgeGreenfield3.5 yrs59.5
EC Near CambridgeGreenfield3.5 yrs59.3
EC Near CambridgeGreenfield3.5 yrs58.9
EC Near CambridgeGreenfield3.5 yrs58.8
EC Near CambridgeGreenfield3.5 yrs58.8
EC Near CambridgeGreenfield3.5 yrs58.1
EC Near CambridgeGreenfield3.5 yrs57.7
EC Near CambridgeGreenfield3.5 yrs57.5
EC Near CambridgeGreenfield3.5 yrs56.8
UNKNOWN131958Substation-Adjacent115 kV100 MW3.3 yrs53.0
EC Near CambridgeGreenfield3.5 yrs53.0
UNKNOWN168017Substation-Adjacent69 kV50 MW3.3 yrs51.8
UNKNOWN158300Substation-Adjacent69 kV50 MW3.3 yrs51.8
TAP168014Substation-Adjacent69 kV50 MW3.3 yrs51.8
TAP168015Substation-Adjacent69 kV50 MW3.3 yrs51.8
UNKNOWN168016Substation-Adjacent69 kV50 MW3.3 yrs51.8
Frenchman-Cambridge (P-S)Federal Excess3.3 yrs51.5
Frenchman-Cambridge (P-S)Federal Excess3.3 yrs51.4
Frenchman-Cambridge (P-S)Federal Excess3.3 yrs51.4
Frenchman-Cambridge (P-S)Federal Excess3.3 yrs51.4
Frenchman-Cambridge (P-S)Federal Excess3.3 yrs51.4
Frenchman-Cambridge (P-S)Federal Excess3.3 yrs51.4
Frenchman-Cambridge (P-S)Federal Excess3.3 yrs51.4

Furnas datacenter FAQ

How many datacenter sites are in Furnas?
123 scored datacenter candidate sites, averaging 48.4/100 DC Readiness.
Does Furnas offer datacenter tax incentives?
ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.
What is the natural-hazard risk in Furnas?
FEMA's National Risk Index rates Furnas as "Relatively Moderate" (score 28).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Furnas, Nebraska. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.