Datacenter Sites in TUNICA, Mississippi

TUNICA has 9 scored datacenter candidate sites averaging 53.1/100 DC Readiness, with a catalogued aggregate of 1,500 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

9
Candidate sites
53.1/100
Avg DC Readiness
1,500 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 9 in TUNICA

Site-selection context for TUNICA

Yessales_tax_exemption
Datacenter tax incentive
11.77¢/kWh
Commercial electricity
7.19¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$4,274
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in TUNICA

Top datacenter sites in TUNICA
SiteTypeVoltageCapacityQueue waitScore
TUNICASubstation-Adjacent230 kV300 MW2.8 yrs59.0
UNKNOWN111260Substation-Adjacent230 kV300 MW2.8 yrs58.8
HAMBRICKSubstation-Adjacent115 kV100 MW2.8 yrs55.2
UNKNOWN110931Substation-Adjacent115 kV100 MW2.8 yrs54.5
Greenfield (TUNICA - ROBINSONVILLE)Greenfield230 kV300 MW2.8 yrs53.0
Greenfield (RITCHIE STATION - TUNICA)Greenfield230 kV300 MW2.8 yrs51.3
MAGNOLIA PROCESSING, INC. (FRESH AND FROZEN SEAFOOD PROCESSING)Manufacturing3.5 yrs49.5
DREXEL CHEMICAL CO. (PESTICIDE AND OTHER AGRICULTURAL CHEMICAL MANUFACTURING)Manufacturing3.5 yrs49.2
Greenfield (UNKNOWN111255 - TUNICA)Greenfield115 kV100 MW2.8 yrs47.4

TUNICA datacenter FAQ

How many datacenter sites are in TUNICA?
9 scored datacenter candidate sites, averaging 53.1/100 DC Readiness.
Does TUNICA offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in TUNICA?
FEMA's National Risk Index rates TUNICA as "Relatively High" (score 45).
What are industrial electricity rates in TUNICA?
Average industrial electricity is 7.19¢/kWh and commercial is 11.77¢/kWh in TUNICA.

Dataset updated . Screening estimates derived from public data sources.