Datacenter Sites in TUNICA, Mississippi

TUNICA has 9 scored datacenter candidate sites averaging 53.2/100 DC Readiness, with a catalogued aggregate of 1,500 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

TUNICA, Mississippi has 9 scored datacenter candidate sites averaging 53.2/100 DC Readiness, roughly in line with the Mississippi average of 53.0. It ranks 70th of 80 Mississippi counties by number of sites and 34th by average score. The top-scoring site is TUNICA at 59.2/100.

9
Candidate sites
53.2/100
Avg DC Readiness
1,500 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 9 in TUNICA

Site-selection context for TUNICA

Yessales_tax_exemption
Datacenter tax incentive
11.77¢/kWh
Commercial electricity
7.19¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$4,274
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

How does TUNICA compare with other counties in Mississippi?

By number of scored sites, TUNICA ranks 70th of the 80 Mississippi counties with a county page, holding 0.3% of the state's 3,104 sites. Its average DC Readiness of 53.2/100 ranks 34th in the state and is roughly in line with the national average of 53.0. Nationally it has the 2493rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 3 score 55 or higher.

What types of datacenter sites are in TUNICA?

Substation-Adjacent sites are the most common (4, 44% of the county's inventory), followed by greenfield (3) and manufacturing (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in TUNICA?

Industrial electricity averages 7.19¢/kWh and commercial 11.77¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (45). WRI water stress is low. 6 fiber providers report service in the county. The climate runs 2,400 cooling degree days a year with a mean temperature of 64°F. Land is valued around $4,274 an acre.

By site type

Top datacenter sites in TUNICA

Top datacenter sites in TUNICA
SiteTypeVoltageCapacityQueue waitScore
TUNICASubstation-Adjacent230 kV300 MW4.3 yrs59.2
UNKNOWN111260Substation-Adjacent230 kV300 MW4.3 yrs59.0
HAMBRICKSubstation-Adjacent115 kV100 MW4.3 yrs55.4
UNKNOWN110931Substation-Adjacent115 kV100 MW4.3 yrs54.7
Greenfield (TUNICA - ROBINSONVILLE)Greenfield230 kV300 MW4.3 yrs53.2
Greenfield (RITCHIE STATION - TUNICA)Greenfield230 kV300 MW4.3 yrs51.9
MAGNOLIA PROCESSING, INC. (FRESH AND FROZEN SEAFOOD PROCESSING)Manufacturing——4.3 yrs49.2
DREXEL CHEMICAL CO. (PESTICIDE AND OTHER AGRICULTURAL CHEMICAL MANUFACTURING)Manufacturing——4.3 yrs48.8
Greenfield (UNKNOWN111255 - TUNICA)Greenfield115 kV100 MW4.3 yrs47.6

Every scored site in TUNICA

All 9 sites, best first.

TUNICA datacenter FAQ

How many datacenter sites are in TUNICA?

9 scored datacenter candidate sites, averaging 53.2/100 DC Readiness. That is the 70th-most of 80 Mississippi counties with five or more sites.

What is the highest-scoring datacenter site in TUNICA?

TUNICA scores 59.2/100 DC Readiness, the highest of the 9 scored sites in TUNICA (a substation-adjacent site).

Does TUNICA offer datacenter tax incentives?

Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

What is the natural-hazard risk in TUNICA?

FEMA's National Risk Index rates TUNICA as "Relatively High" (score 45).

What are industrial electricity rates in TUNICA?

Average industrial electricity is 7.19¢/kWh and commercial is 11.77¢/kWh in TUNICA.

More in Mississippi

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in TUNICA, Mississippi”, https://gridcensus.com/datacenter-sites/mississippi/tunica (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for TUNICA, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.