Datacenter Sites in TUNICA, Mississippi
TUNICA has 9 scored datacenter candidate sites averaging 53.2/100 DC Readiness, with a catalogued aggregate of 1,500 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
TUNICA, Mississippi has 9 scored datacenter candidate sites averaging 53.2/100 DC Readiness, roughly in line with the Mississippi average of 53.0. It ranks 70th of 80 Mississippi counties by number of sites and 34th by average score. The top-scoring site is TUNICA at 59.2/100.
Site-selection context for TUNICA
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
How does TUNICA compare with other counties in Mississippi?
By number of scored sites, TUNICA ranks 70th of the 80 Mississippi counties with a county page, holding 0.3% of the state's 3,104 sites. Its average DC Readiness of 53.2/100 ranks 34th in the state and is roughly in line with the national average of 53.0. Nationally it has the 2493rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 3 score 55 or higher.
What types of datacenter sites are in TUNICA?
Substation-Adjacent sites are the most common (4, 44% of the county's inventory), followed by greenfield (3) and manufacturing (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in TUNICA?
Industrial electricity averages 7.19¢/kWh and commercial 11.77¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (45). WRI water stress is low. 6 fiber providers report service in the county. The climate runs 2,400 cooling degree days a year with a mean temperature of 64°F. Land is valued around $4,274 an acre.
By site type
Top datacenter sites in TUNICA
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| TUNICA | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 59.2 |
| UNKNOWN111260 | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 59.0 |
| HAMBRICK | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.4 |
| UNKNOWN110931 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 54.7 |
| Greenfield (TUNICA - ROBINSONVILLE) | Greenfield | 230 kV | 300 MW | 4.3 yrs | 53.2 |
| Greenfield (RITCHIE STATION - TUNICA) | Greenfield | 230 kV | 300 MW | 4.3 yrs | 51.9 |
| MAGNOLIA PROCESSING, INC. (FRESH AND FROZEN SEAFOOD PROCESSING) | Manufacturing | — | — | 4.3 yrs | 49.2 |
| DREXEL CHEMICAL CO. (PESTICIDE AND OTHER AGRICULTURAL CHEMICAL MANUFACTURING) | Manufacturing | — | — | 4.3 yrs | 48.8 |
| Greenfield (UNKNOWN111255 - TUNICA) | Greenfield | 115 kV | 100 MW | 4.3 yrs | 47.6 |
Every scored site in TUNICA
All 9 sites, best first.
- TUNICA · 59.2
- Substation-Adjacent site · 752d3554 · 59.0
- HAMBRICK · 55.4
- Substation-Adjacent site · fd5b4143 · 54.7
- Greenfield (TUNICA - ROBINSONVILLE) · 53.2
- Greenfield (RITCHIE STATION - TUNICA) · 51.9
- MAGNOLIA PROCESSING, INC. (FRESH AND FROZEN SEAFOOD PROCESSING) · 49.2
- DREXEL CHEMICAL CO. (PESTICIDE AND OTHER AGRICULTURAL CHEMICAL MANUFACTURING) · 48.8
- Greenfield (UNKNOWN111255 - TUNICA) · 47.6
TUNICA datacenter FAQ
How many datacenter sites are in TUNICA?
9 scored datacenter candidate sites, averaging 53.2/100 DC Readiness. That is the 70th-most of 80 Mississippi counties with five or more sites.
What is the highest-scoring datacenter site in TUNICA?
TUNICA scores 59.2/100 DC Readiness, the highest of the 9 scored sites in TUNICA (a substation-adjacent site).
Does TUNICA offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in TUNICA?
FEMA's National Risk Index rates TUNICA as "Relatively High" (score 45).
What are industrial electricity rates in TUNICA?
Average industrial electricity is 7.19¢/kWh and commercial is 11.77¢/kWh in TUNICA.
More in Mississippi
- All datacenter sites in Mississippi· 3,104 sites
- Operating datacenters in Mississippi
- Electric substations in Mississippi
- Hinds· 201 sites · avg 52.4
- Forrest County· 146 sites · avg 51.6
- DeSoto County· 137 sites · avg 55.9
- Jackson County· 132 sites · avg 53.6
- Lee County· 126 sites · avg 53.5
- Harrison County· 118 sites · avg 53.5
- Substation-Adjacent sites in Mississippi
- Greenfield sites in Mississippi
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in TUNICA, Mississippi”, https://gridcensus.com/datacenter-sites/mississippi/tunica (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for TUNICA, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.