UNKNOWN110931

Substation-Adjacent

TUNICA, Mississippi · MISO

DC Readiness
54.5
Fair / 100

UNKNOWN110931 is a substation-adjacent datacenter candidate site in TUNICA, Mississippi, interconnecting through MISO. It screens at 54.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN110931
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityENTERGY MISSISSIPPI LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth59
Avg queue wait2.8 yrs

Connectivity

Nearest IXPLevel(3) Memphis
IXP distance38.8 mi
Fiber providers6
Fiber coverage24.9%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterxAI Macrohardrr
DC distance34.5 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.77¢/kWh
Industrial electricity7.19¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$4,274

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN110931

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
49
Fiber connectivity12%
58
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in TUNICA, ranked by DC Readiness.

Sites near UNKNOWN110931
SiteTypeVoltageCapacityQueue waitScore
TUNICASubstation-Adjacent230 kV300 MW2.8 yrs59.0
UNKNOWN111260Substation-Adjacent230 kV300 MW2.8 yrs58.8
HAMBRICKSubstation-Adjacent115 kV100 MW2.8 yrs55.2
Greenfield (TUNICA - ROBINSONVILLE)Greenfield230 kV300 MW2.8 yrs53.0
Greenfield (RITCHIE STATION - TUNICA)Greenfield230 kV300 MW2.8 yrs51.3
MAGNOLIA PROCESSING, INC. (FRESH AND FROZEN SEAFOOD PROCESSING)Manufacturing3.5 yrs49.5
DREXEL CHEMICAL CO. (PESTICIDE AND OTHER AGRICULTURAL CHEMICAL MANUFACTURING)Manufacturing3.5 yrs49.2
Greenfield (UNKNOWN111255 - TUNICA)Greenfield115 kV100 MW2.8 yrs47.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN110931, TUNICA. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.