PIKE has 47 scored datacenter candidate sites averaging 50.2/100 DC Readiness, with a catalogued aggregate of 1,200 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

47
Candidate sites
50.2/100
Avg DC Readiness
1,200 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in PIKE

Site-selection context for PIKE

Yessales_tax_exemption
Datacenter tax incentive
13.68¢/kWh
Commercial electricity
8.38¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$4,636
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in PIKE

Top datacenter sites in PIKE
SiteTypeVoltageCapacityQueue waitScore
EC FFE Pike CountyGreenfield1.4 yrs58.8
OZ PikeGreenfield1.4 yrs56.0
UNKNOWN110649Substation-Adjacent115 kV100 MW2.8 yrs55.1
TAP143360Substation-Adjacent115 kV100 MW2.8 yrs54.9
TAP143361Substation-Adjacent115 kV100 MW2.8 yrs54.5
UNKNOWN110648Substation-Adjacent115 kV100 MW2.8 yrs54.4
UNKNOWN110830Substation-Adjacent115 kV100 MW2.8 yrs54.3
EAST MCCOMBSubstation-Adjacent115 kV100 MW2.8 yrs54.3
UNKNOWN110645Substation-Adjacent115 kV100 MW2.8 yrs54.0
UNKNOWN110829Substation-Adjacent115 kV100 MW2.8 yrs54.0
TAP143091Substation-Adjacent115 kV100 MW2.8 yrs53.7
JAYESSSubstation-Adjacent115 kV100 MW2.8 yrs53.3
SASSONE'S TIMBER, LLC (LOGGING)Manufacturing3.5 yrs49.8
AGRO DISTRIBUTION, LLC (FERTILIZER (MIXING ONLY) MANUFACTURING)Manufacturing3.5 yrs49.7
SOUTHEASTERN RAILWAY SERVICES, INC. (NOT AVAILABLE)Manufacturing3.5 yrs49.7
FABRICATED PIPE, INC. (FABRICATED PIPE AND PIPE FITTING MANUFACTURING)Manufacturing3.5 yrs49.0
EASTERN BLOCK, INC. (OTHER ANIMAL FOOD MANUFACTURING)Manufacturing3.5 yrs49.0
INTERNATIONAL PAPER, INC. (CORRUGATED AND SOLID FIBER BOX MANUFACTURING)Manufacturing3.5 yrs49.0
US CORRUGATED (FOLDING PAPERBOARD BOX MANUFACTURING)Manufacturing3.5 yrs49.0
BYRD LUMBER CO., INC., W. L. (SAWMILLS)Manufacturing3.5 yrs49.0
MCCOMB MILL MFG. CO. (ALL OTHER MISCELLANEOUS TEXTILE PRODUCT MILLS)Manufacturing3.5 yrs49.0
DIXIE PACKAGING, INC. (PLASTICS BAG MANUFACTURING)Manufacturing3.5 yrs49.0
MORGAN BUILDINGS & SPAS (PREFABRICATED METAL BUILDING AND COMPONENT MANUFACTURING)Manufacturing3.5 yrs49.0
GREAT AMERICAN WIREBOUND BOX CO. (WOOD CONTAINER AND PALLET MANUFACTURING)Manufacturing3.5 yrs49.0
WEYERHAEUSER CO. (NOT AVAILABLE)Manufacturing3.5 yrs48.9

PIKE datacenter FAQ

How many datacenter sites are in PIKE?
47 scored datacenter candidate sites, averaging 50.2/100 DC Readiness.
Does PIKE offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in PIKE?
FEMA's National Risk Index rates PIKE as "Relatively High" (score 45).
What are industrial electricity rates in PIKE?
Average industrial electricity is 8.38¢/kWh and commercial is 13.68¢/kWh in PIKE.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen