EC FFE Pike County

Greenfield

PIKE, Mississippi · MISO

DC Readiness
58.8
Good / 100

EC FFE Pike County is a greenfield datacenter candidate site in PIKE, Mississippi, interconnecting through MISO. It screens at 58.8/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_MS
Wholesale LMP$31.68/MWh
Utility commercial rate0.14¢/kWh
UtilityENTERGY MISSISSIPPI LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth59
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPVenyu BTR1
IXP distance65.3 mi
Fiber providers4
Fiber coverage47.8%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance390.6 mi

Site characteristics

Site typeGreenfield
Land contactPike County County Assessor
Parcel APN800591
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity
Former usefossil fuel employment

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteD M EQUIPMENT
Hazard sub-score45/100
Construction cost index58.5 (avg 100)

Location context

Nearest datacenterVenyu BTR1
DC distance65.3 mi
Nearest rail2.4 mi
Nearest gas pipeline1.6 mi
Nearest fiber route69.7 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.68¢/kWh
Industrial electricity8.38¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$4,636

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC FFE Pike County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
55
Fiber connectivity12%
62
Energy cost10%
85
Water risk7%
93
Natural hazard6%
45
Buildability7%
92
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
100
Gas pipeline2%
95
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in PIKE, ranked by DC Readiness.

Sites near EC FFE Pike County
SiteTypeVoltageCapacityQueue waitScore
OZ PikeGreenfield1.4 yrs56.0
UNKNOWN110649Substation-Adjacent115 kV100 MW2.8 yrs55.1
TAP143360Substation-Adjacent115 kV100 MW2.8 yrs54.9
TAP143361Substation-Adjacent115 kV100 MW2.8 yrs54.5
UNKNOWN110648Substation-Adjacent115 kV100 MW2.8 yrs54.4
UNKNOWN110830Substation-Adjacent115 kV100 MW2.8 yrs54.3
EAST MCCOMBSubstation-Adjacent115 kV100 MW2.8 yrs54.3
UNKNOWN110829Substation-Adjacent115 kV100 MW2.8 yrs54.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC FFE Pike County, PIKE. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.