Datacenter Sites in OKTIBBEHA, Mississippi

OKTIBBEHA has 40 scored datacenter candidate sites averaging 58.7/100 DC Readiness, with a catalogued aggregate of 1,550 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

OKTIBBEHA, Mississippi has 40 scored datacenter candidate sites averaging 58.7/100 DC Readiness, about 11% above the Mississippi average of 53.0. It ranks 24th of 80 Mississippi counties by number of sites and 2nd by average score. The top-scoring site is OZ Oktibbeha at 66.9/100.

40
Candidate sites
58.7/100
Avg DC Readiness
1,550 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in OKTIBBEHA

Site-selection context for OKTIBBEHA

Yessales_tax_exemption
Datacenter tax incentive
11.37¢/kWh
Commercial electricity
5.97¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$2,845
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

How does OKTIBBEHA compare with other counties in Mississippi?

By number of scored sites, OKTIBBEHA ranks 24th of the 80 Mississippi counties with a county page, holding 1.3% of the state's 3,104 sites. Its average DC Readiness of 58.7/100 ranks 2nd in the state and is about 11% above the national average of 53.0. Nationally it has the 969th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 40 score 55 or higher.

What types of datacenter sites are in OKTIBBEHA?

Industrial sites are the most common (20, 50% of the county's inventory), followed by manufacturing (11) and substation-adjacent (7). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in OKTIBBEHA?

Industrial electricity averages 5.97¢/kWh and commercial 11.37¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (45). WRI water stress is low. 6 fiber providers report service in the county. The climate runs 2,400 cooling degree days a year with a mean temperature of 64°F. Land is valued around $2,845 an acre.

By site type

Top datacenter sites in OKTIBBEHA

Top datacenter sites in OKTIBBEHA
SiteTypeVoltageCapacityQueue waitScore
OZ OktibbehaGreenfield——3.9 yrs66.9
TAP161257Substation-Adjacent161 kV100 MW3.9 yrs64.4
UNKNOWN109618Substation-Adjacent161 kV100 MW3.9 yrs64.2
UNKNOWN109569Substation-Adjacent161 kV100 MW3.9 yrs64.1
Greenfield (UNKNOWN109619 - WESTPOINT)Greenfield500 kV1,000 MW3.9 yrs63.6
UNKNOWN109623Substation-Adjacent161 kV100 MW3.9 yrs62.9
UNKNOWN109624Substation-Adjacent69 kV50 MW3.9 yrs61.6
UNKNOWN109626Substation-Adjacent69 kV50 MW3.9 yrs61.5
UNKNOWN109625Substation-Adjacent69 kV50 MW3.9 yrs60.7
SEMISOUTH LABORATORIES, INC. (SEMICONDUCTOR AND RELATED DEVICE MANUFACTURING)Manufacturing——3.9 yrs57.8
OCEDA/Former MSU Sanitary LandfillIndustrial——3.9 yrs57.8
134 MLK DriveIndustrial——3.9 yrs57.7
Greensboro Center (Former Starkville High School)Industrial——3.9 yrs57.7
HPM Development Lot 1Industrial——3.9 yrs57.7
Suddeth ElementaryIndustrial——3.9 yrs57.7
County School Bus GarageIndustrial——3.9 yrs57.7
115 MLK Drive (Former McColly Tire)Industrial——3.9 yrs57.7
Pure Gas StationIndustrial——3.9 yrs57.7
HPM Development Lot 2Industrial——3.9 yrs57.7
Coca Cola Bottling PlantIndustrial——3.9 yrs57.7
STARKVILLE DAILY NEWS (PREPRESS SERVICES)Manufacturing——3.9 yrs57.7
Humble Oil PropertyIndustrial——3.9 yrs57.7
Old City HallIndustrial——3.9 yrs57.7
School Board Bus BarnIndustrial——3.9 yrs57.7
Overstreet ElementaryIndustrial——3.9 yrs57.7

Every scored site in OKTIBBEHA

All 40 sites, best first.

OKTIBBEHA datacenter FAQ

How many datacenter sites are in OKTIBBEHA?

40 scored datacenter candidate sites, averaging 58.7/100 DC Readiness. That is the 24th-most of 80 Mississippi counties with five or more sites.

What is the highest-scoring datacenter site in OKTIBBEHA?

OZ Oktibbeha scores 66.9/100 DC Readiness, the highest of the 40 scored sites in OKTIBBEHA (a greenfield site).

Does OKTIBBEHA offer datacenter tax incentives?

Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

What is the natural-hazard risk in OKTIBBEHA?

FEMA's National Risk Index rates OKTIBBEHA as "Relatively High" (score 45).

What are industrial electricity rates in OKTIBBEHA?

Average industrial electricity is 5.97¢/kWh and commercial is 11.37¢/kWh in OKTIBBEHA.

More in Mississippi

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in OKTIBBEHA, Mississippi”, https://gridcensus.com/datacenter-sites/mississippi/oktibbeha (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for OKTIBBEHA, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.