DC Readiness
55.6
Good / 100

HY-GAIN (RADIO AND TELEVISION BROADCASTING AND WIRELESS COMMUNICATIONS EQUIPMENT MANUFACTURING) is a manufacturing datacenter candidate site in OKTIBBEHA, Mississippi. It screens at 55.6/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Utility4-COUNTY ELECTRIC POWER ASSNcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

Avg queue wait3.5 yrs

Connectivity

Nearest IXPC Spire Mississippi
IXP distance3.3 mi
Fiber providers6
Fiber coverage92.9%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterC Spire Mississippi
DC distance3.3 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.37¢/kWh
Industrial electricity5.97¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,845

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track HY-GAIN (RADIO AND TELEVISION BROADCASTING AND WIRELESS COMMUNICATIONS EQUIPMENT MANUFACTURING)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
49
Fiber connectivity12%
97
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in OKTIBBEHA, ranked by DC Readiness.

Sites near HY-GAIN (RADIO AND TELEVISION BROADCASTING AND WIRELESS COMMUNICATIONS EQUIPMENT MANUFACTURING)
SiteTypeVoltageCapacityQueue waitScore
OZ OktibbehaGreenfield——1.4 yrs64.5
TAP161257Substation-Adjacent161 kV100 MW2.8 yrs60.9
UNKNOWN109618Substation-Adjacent161 kV100 MW2.8 yrs60.6
UNKNOWN109569Substation-Adjacent161 kV100 MW2.8 yrs60.5
Greenfield (UNKNOWN109619 - WESTPOINT)Greenfield500 kV1,000 MW2.8 yrs60.1
UNKNOWN109623Substation-Adjacent161 kV100 MW2.8 yrs59.3
UNKNOWN109624Substation-Adjacent69 kV50 MW2.8 yrs58.0
UNKNOWN109626Substation-Adjacent69 kV50 MW2.8 yrs57.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for HY-GAIN (RADIO AND TELEVISION BROADCASTING AND WIRELESS COMMUNICATIONS EQUIPMENT MANUFACTURING), OKTIBBEHA is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.