Datacenter Sites in Neshoba County, Mississippi
Neshoba County has 36 scored datacenter candidate sites averaging 51.2/100 DC Readiness, with a catalogued aggregate of 1,200 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
36
Candidate sites
51.2/100
Avg DC Readiness
1,200 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for Neshoba County
Yessales_tax_exemption
Datacenter tax incentive
11.44¢/kWh
Commercial electricity
7.04¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$3,021
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
By site type
Top datacenter sites in Neshoba County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Coal Neshoba County | Greenfield | — | — | 1.4 yrs | 58.2 |
| EC Coal Neshoba County | Greenfield | — | — | 1.4 yrs | 56.7 |
| UNKNOWN161205 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.5 |
| UNKNOWN109398 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.5 |
| UNKNOWN150008 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.5 |
| PHILADELPHIA | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.5 |
| TAP161206 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.2 |
| UNKNOWN109385 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.0 |
| PEARL RIVER | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.0 |
| TAP146071 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.0 |
| UNKNOWN109368 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.0 |
| OZ Neshoba | Greenfield | — | — | 1.4 yrs | 54.2 |
| EC Coal Neshoba County | Greenfield | — | — | 1.4 yrs | 53.5 |
| PECO FOODS, INC. (OTHER ANIMAL FOOD MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 49.4 |
| TYSON FOODS, INC. (OTHER ANIMAL FOOD MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 49.4 |
| SUDDEN SERVICE (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 49.4 |
| WEYERHAEUSER CO. (SAWMILLS) | Manufacturing | — | — | 3.5 yrs | 49.3 |
| ABILITYWORKS, INC. (ALL OTHER MISCELLANEOUS MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 49.3 |
| NESHOBA COUNTY GIN (OTHER ANIMAL FOOD MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 49.3 |
| WELLS LAMONT INDUSTRIES GROUP (GLOVE AND MITTEN MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 49.3 |
| RICHARDSON MOLDING, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 49.3 |
| THOMASSON COMPANY (CUT STOCK, RESAWING LUMBER, AND PLANING) | Manufacturing | — | — | 3.5 yrs | 49.2 |
| PHILADELPHIA SHEET METAL WORKS, INC. (IRON AND STEEL MILLS) | Manufacturing | — | — | 3.5 yrs | 49.2 |
| SMITH ENTERPRISES, INC., B.R. (MACHINE SHOPS) | Manufacturing | — | — | 3.5 yrs | 49.0 |
| HARDY MFG. CO., INC. (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 49.0 |
Neshoba County datacenter FAQ
- How many datacenter sites are in Neshoba County?
- 36 scored datacenter candidate sites, averaging 51.2/100 DC Readiness.
- Does Neshoba County offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
- What is the natural-hazard risk in Neshoba County?
- FEMA's National Risk Index rates Neshoba County as "Relatively High" (score 45).
- What are industrial electricity rates in Neshoba County?
- Average industrial electricity is 7.04¢/kWh and commercial is 11.44¢/kWh in Neshoba County.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Neshoba County, Mississippi. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.