EC Coal Neshoba County

Greenfield

Neshoba County, Mississippi · MISO

DC Readiness
56.7
Good / 100

EC Coal Neshoba County is a greenfield datacenter candidate site in Neshoba County, Mississippi, interconnecting through MISO. It screens at 56.7/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_MS
Wholesale LMP$31.68/MWh
Utility commercial rate0.11¢/kWh
UtilityMISSISSIPPI POWER COinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth59
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPC Spire Mississippi
IXP distance44.7 mi
Fiber providers4
Fiber coverage33.6%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance452.8 mi

Site characteristics

Site typeGreenfield
Land contactNeshoba County County Assessor
Parcel APN00900 -32 -011.002
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity
Former usecoal adjacent

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score55/100
Construction cost index106.2 (avg 100)

Location context

Nearest datacenterC Spire Mississippi
DC distance44.7 mi
Nearest rail6.2 mi
Nearest gas pipeline4.2 mi
Nearest fiber route86.2 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.44¢/kWh
Industrial electricity7.04¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,021

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Coal Neshoba County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
55
Fiber connectivity12%
47
Energy cost10%
85
Water risk7%
84
Natural hazard6%
55
Buildability7%
95
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
62
Gas pipeline2%
87
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in Neshoba County, ranked by DC Readiness.

Sites near EC Coal Neshoba County
SiteTypeVoltageCapacityQueue waitScore
EC Coal Neshoba CountyGreenfield——1.4 yrs58.2
UNKNOWN161205Substation-Adjacent161 kV100 MW2.8 yrs55.5
UNKNOWN109398Substation-Adjacent161 kV100 MW2.8 yrs55.5
PHILADELPHIASubstation-Adjacent161 kV100 MW2.8 yrs55.5
UNKNOWN150008Substation-Adjacent161 kV100 MW2.8 yrs55.5
TAP161206Substation-Adjacent161 kV100 MW2.8 yrs55.2
TAP146071Substation-Adjacent161 kV100 MW2.8 yrs55.0
PEARL RIVERSubstation-Adjacent161 kV100 MW2.8 yrs55.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.