LOWNDES has 88 scored datacenter candidate sites averaging 55.3/100 DC Readiness, with a catalogued aggregate of 2,500 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

LOWNDES, Mississippi has 88 scored datacenter candidate sites averaging 55.3/100 DC Readiness, roughly in line with the Mississippi average of 53.0. It ranks 9th of 80 Mississippi counties by number of sites and 8th by average score. The top-scoring site is LOWNDES at 67.6/100.

88
Candidate sites
55.3/100
Avg DC Readiness
2,500 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in LOWNDES

Site-selection context for LOWNDES

Yessales_tax_exemption
Datacenter tax incentive
11.94¢/kWh
Commercial electricity
5.75¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$3,174
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

How does LOWNDES compare with other counties in Mississippi?

By number of scored sites, LOWNDES ranks 9th of the 80 Mississippi counties with a county page, holding 2.8% of the state's 3,104 sites. Its average DC Readiness of 55.3/100 ranks 8th in the state and is roughly in line with the national average of 53.0. Nationally it has the 380th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 20 score 55 or higher.

What types of datacenter sites are in LOWNDES?

Manufacturing sites are the most common (42, 48% of the county's inventory), followed by industrial (18) and substation-adjacent (14). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in LOWNDES?

Industrial electricity averages 5.75¢/kWh and commercial 11.94¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (45). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 2,400 cooling degree days a year with a mean temperature of 64°F. Land is valued around $3,174 an acre.

By site type

Top datacenter sites in LOWNDES

Top datacenter sites in LOWNDES
SiteTypeVoltageCapacityQueue waitScore
LOWNDESSubstation-Adjacent500 kV1,000 MW3.9 yrs67.6
UNKNOWN109567Substation-Adjacent161 kV100 MW3.9 yrs62.5
UNKNOWN109565Substation-Adjacent161 kV100 MW3.9 yrs62.5
TAP169476Substation-Adjacent161 kV100 MW3.9 yrs62.4
UNKNOWN109563Substation-Adjacent161 kV100 MW3.9 yrs61.1
TAP169474Substation-Adjacent161 kV100 MW3.9 yrs61.1
WEYERHAEUSER COSubstation-Adjacent161 kV100 MW3.9 yrs61.0
TAP144760Substation-Adjacent161 kV100 MW3.9 yrs61.0
UNKNOWN109561Substation-Adjacent161 kV100 MW3.9 yrs60.8
UNKNOWN109571Substation-Adjacent161 kV100 MW3.9 yrs60.6
TAP144762Substation-Adjacent161 kV100 MW3.9 yrs60.6
TAP144763Substation-Adjacent161 kV100 MW3.9 yrs60.5
UNKNOWN109589Substation-Adjacent161 kV100 MW3.9 yrs60.4
TAP144769Substation-Adjacent161 kV100 MW3.9 yrs60.3
Mine SiteFormer Mine——3.9 yrs56.2
HOLCIM (US), INC. (CEMENT MANUFACTURING)Manufacturing——3.9 yrs56.0
SEVERCORR, LLC (NOT AVAILABLE)Manufacturing——3.9 yrs55.9
AMERICAN EUROCOPTER, LLC (NOT AVAILABLE)Manufacturing——3.9 yrs55.8
MISSISSIPPI PRECISION (NOT AVAILABLE)Manufacturing——3.9 yrs55.8
WEYERHAEUSER CO. (PULP MILLS)Manufacturing——3.9 yrs55.7
COLUMBUS (BIGBE) MSFederal Excess——3.9 yrs54.9
1336 North Frontage RoadIndustrial——3.9 yrs54.4
Greenfield (UNKNOWN109560 - TAP144789)Greenfield161 kV100 MW3.9 yrs54.4
COLUMBUS (BIGBE) MSFederal Excess——3.9 yrs54.4
SQWINCHER CORPORATION (FLAVORING SYRUP AND CONCENTRATE MANUFACTURING)Manufacturing——3.9 yrs54.4

Every scored site in LOWNDES

All 88 sites, best first.

LOWNDES datacenter FAQ

How many datacenter sites are in LOWNDES?

88 scored datacenter candidate sites, averaging 55.3/100 DC Readiness. That is the 9th-most of 80 Mississippi counties with five or more sites.

What is the highest-scoring datacenter site in LOWNDES?

LOWNDES scores 67.6/100 DC Readiness, the highest of the 88 scored sites in LOWNDES (a substation-adjacent site).

Does LOWNDES offer datacenter tax incentives?

Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

What is the natural-hazard risk in LOWNDES?

FEMA's National Risk Index rates LOWNDES as "Relatively High" (score 45).

What are industrial electricity rates in LOWNDES?

Average industrial electricity is 5.75¢/kWh and commercial is 11.94¢/kWh in LOWNDES.

More in Mississippi

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in LOWNDES, Mississippi”, https://gridcensus.com/datacenter-sites/mississippi/lowndes (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for LOWNDES, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.