Datacenter Sites in LOWNDES, Mississippi

LOWNDES has 88 scored datacenter candidate sites averaging 53.7/100 DC Readiness, with a catalogued aggregate of 2,500 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

88
Candidate sites
53.7/100
Avg DC Readiness
2,500 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in LOWNDES

Site-selection context for LOWNDES

Yessales_tax_exemption
Datacenter tax incentive
11.94¢/kWh
Commercial electricity
5.75¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$3,174
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in LOWNDES

Top datacenter sites in LOWNDES
SiteTypeVoltageCapacityQueue waitScore
LOWNDESSubstation-Adjacent500 kV1,000 MW2.8 yrs65.8
UNKNOWN109565Substation-Adjacent161 kV100 MW2.8 yrs60.7
UNKNOWN109567Substation-Adjacent161 kV100 MW2.8 yrs60.7
TAP169476Substation-Adjacent161 kV100 MW2.8 yrs60.6
UNKNOWN109563Substation-Adjacent161 kV100 MW2.8 yrs59.3
TAP169474Substation-Adjacent161 kV100 MW2.8 yrs59.3
TAP144760Substation-Adjacent161 kV100 MW2.8 yrs59.2
WEYERHAEUSER COSubstation-Adjacent161 kV100 MW2.8 yrs59.2
UNKNOWN109561Substation-Adjacent161 kV100 MW2.8 yrs59.0
UNKNOWN109571Substation-Adjacent161 kV100 MW2.8 yrs58.8
TAP144762Substation-Adjacent161 kV100 MW2.8 yrs58.8
TAP144763Substation-Adjacent161 kV100 MW2.8 yrs58.7
UNKNOWN109589Substation-Adjacent161 kV100 MW2.8 yrs58.6
TAP144769Substation-Adjacent161 kV100 MW2.8 yrs58.5
HOLCIM (US), INC. (CEMENT MANUFACTURING)Manufacturing3.5 yrs54.7
AMERICAN EUROCOPTER, LLC (NOT AVAILABLE)Manufacturing3.5 yrs54.6
SEVERCORR, LLC (NOT AVAILABLE)Manufacturing3.5 yrs54.6
MISSISSIPPI PRECISION (NOT AVAILABLE)Manufacturing3.5 yrs54.5
WEYERHAEUSER CO. (PULP MILLS)Manufacturing3.5 yrs54.5
Mine SiteFormer Mine2.8 yrs54.4
SQWINCHER CORPORATION (FLAVORING SYRUP AND CONCENTRATE MANUFACTURING)Manufacturing3.5 yrs53.1
COLUMBUS SCRAP MATERIAL CO., INC. (SECONDARY SMELTING, REFINING, AND ALLOYING OF NONFERROUS METAL (EXCEPT COPPER AND ALUMINUM))Manufacturing3.5 yrs53.1
BALDOR ELECTRIC CO. (MOTOR AND GENERATOR MANUFACTURING)Manufacturing3.5 yrs53.0
THE COMMERCIAL DISPATCH (NOT AVAILABLE)Manufacturing3.5 yrs53.0
MMC MATERIALS, INC. (READY-MIX CONCRETE MANUFACTURING)Manufacturing3.5 yrs52.9

LOWNDES datacenter FAQ

How many datacenter sites are in LOWNDES?
88 scored datacenter candidate sites, averaging 53.7/100 DC Readiness.
Does LOWNDES offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in LOWNDES?
FEMA's National Risk Index rates LOWNDES as "Relatively High" (score 45).
What are industrial electricity rates in LOWNDES?
Average industrial electricity is 5.75¢/kWh and commercial is 11.94¢/kWh in LOWNDES.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for LOWNDES, Mississippi. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.