Datacenter Sites in LOWNDES, Mississippi
LOWNDES has 88 scored datacenter candidate sites averaging 53.7/100 DC Readiness, with a catalogued aggregate of 2,500 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
88
Candidate sites
53.7/100
Avg DC Readiness
2,500 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for LOWNDES
Yessales_tax_exemption
Datacenter tax incentive
11.94¢/kWh
Commercial electricity
5.75¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$3,174
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
By site type
Top datacenter sites in LOWNDES
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| LOWNDES | Substation-Adjacent | 500 kV | 1,000 MW | 2.8 yrs | 65.8 |
| UNKNOWN109565 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 60.7 |
| UNKNOWN109567 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 60.7 |
| TAP169476 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 60.6 |
| UNKNOWN109563 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 59.3 |
| TAP169474 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 59.3 |
| TAP144760 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 59.2 |
| WEYERHAEUSER CO | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 59.2 |
| UNKNOWN109561 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 59.0 |
| UNKNOWN109571 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 58.8 |
| TAP144762 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 58.8 |
| TAP144763 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 58.7 |
| UNKNOWN109589 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 58.6 |
| TAP144769 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 58.5 |
| HOLCIM (US), INC. (CEMENT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 54.7 |
| AMERICAN EUROCOPTER, LLC (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 54.6 |
| SEVERCORR, LLC (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 54.6 |
| MISSISSIPPI PRECISION (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 54.5 |
| WEYERHAEUSER CO. (PULP MILLS) | Manufacturing | — | — | 3.5 yrs | 54.5 |
| Mine Site | Former Mine | — | — | 2.8 yrs | 54.4 |
| SQWINCHER CORPORATION (FLAVORING SYRUP AND CONCENTRATE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.1 |
| COLUMBUS SCRAP MATERIAL CO., INC. (SECONDARY SMELTING, REFINING, AND ALLOYING OF NONFERROUS METAL (EXCEPT COPPER AND ALUMINUM)) | Manufacturing | — | — | 3.5 yrs | 53.1 |
| BALDOR ELECTRIC CO. (MOTOR AND GENERATOR MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.0 |
| THE COMMERCIAL DISPATCH (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 53.0 |
| MMC MATERIALS, INC. (READY-MIX CONCRETE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.9 |
LOWNDES datacenter FAQ
- How many datacenter sites are in LOWNDES?
- 88 scored datacenter candidate sites, averaging 53.7/100 DC Readiness.
- Does LOWNDES offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
- What is the natural-hazard risk in LOWNDES?
- FEMA's National Risk Index rates LOWNDES as "Relatively High" (score 45).
- What are industrial electricity rates in LOWNDES?
- Average industrial electricity is 5.75¢/kWh and commercial is 11.94¢/kWh in LOWNDES.
Dataset updated . Screening estimates derived from public data sources.