Datacenter Sites in GRENADA, Mississippi

GRENADA has 35 scored datacenter candidate sites averaging 51.7/100 DC Readiness, with a catalogued aggregate of 1,900 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

35
Candidate sites
51.7/100
Avg DC Readiness
1,900 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating

Site-selection context for GRENADA

Yessales_tax_exemption
Datacenter tax incentive
12.71¢/kWh
Commercial electricity
9.02¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$2,691
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in GRENADA

Top datacenter sites in GRENADA
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110070Substation-Adjacent230 kV300 MW1.4 yrs68.5
UNKNOWN110071Substation-Adjacent230 kV300 MW1.4 yrs68.5
TAP169450Substation-Adjacent161 kV100 MW1.4 yrs64.4
TAP144812Substation-Adjacent115 kV100 MW1.4 yrs63.7
UNKNOWN109984Substation-Adjacent161 kV100 MW1.4 yrs63.3
UNKNOWN109985Substation-Adjacent161 kV100 MW1.4 yrs63.0
UNKNOWN169449Substation-Adjacent161 kV100 MW1.4 yrs62.8
Greenfield (UNKNOWN110070 - TILLATOBA)Greenfield230 kV300 MW1.4 yrs62.2
TAP142867Substation-Adjacent161 kV100 MW1.4 yrs61.7
Greenfield (UNKNOWN110071 - TILLATOBA)Greenfield230 kV300 MW1.4 yrs60.1
EC FFE Grenada CountyGreenfield1.4 yrs57.8
UNKNOWN110069Substation-Adjacent115 kV100 MW1.4 yrs57.5
GEORGIA-PACIFIC LLC (CUT STOCK, RESAWING LUMBER, AND PLANING)Manufacturing46.7
BINSWANGER MIRROR (GLASS PRODUCT MANUFACTURING MADE OF PURCHASED GLASS)Manufacturing46.7
GOOD EARTH HORTICULTURE, INC. (CUT STOCK, RESAWING LUMBER, AND PLANING)Manufacturing46.7
HANKINS LUMBER CO., INC. (SAWMILLS)Manufacturing46.7
KOPPERS, INC. (CUT STOCK, RESAWING LUMBER, AND PLANING)Manufacturing46.7
THOMAS WOOD PRESERVING, INC. (WOOD PRESERVATION)Manufacturing46.7
PIONEER COLD STORAGE WAREHOUSE CO. (MEAT PROCESSED FROM CARCASSES)Manufacturing46.7
HANKINS LUMBER CO., INC., #2 (SAWMILLS)Manufacturing46.7
HEATCRAFT COILS-LUVATA (POWER BOILER AND HEAT EXCHANGER MANUFACTURING)Manufacturing46.7
VALLEY RACKS, INC. (OTHER FABRICATED WIRE PRODUCT MANUFACTURING)Manufacturing46.7
COOK PORTABLE WAREHOUSES, INC. (PREFABRICATED WOOD BUILDING MANUFACTURING)Manufacturing45.9
HARRELL'S METAL WORKS (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING)Manufacturing45.9
GRENADA STAMPING & ASSEMBLY (METAL STAMPING)Manufacturing45.9

GRENADA datacenter FAQ

How many datacenter sites are in GRENADA?
35 scored datacenter candidate sites, averaging 51.7/100 DC Readiness.
Does GRENADA offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in GRENADA?
FEMA's National Risk Index rates GRENADA as "Relatively High" (score 45).
What are industrial electricity rates in GRENADA?
Average industrial electricity is 9.02¢/kWh and commercial is 12.71¢/kWh in GRENADA.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for GRENADA, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.