Datacenter Sites in GRENADA, Mississippi
GRENADA has 30 scored datacenter candidate sites averaging 51.3/100 DC Readiness, with a catalogued aggregate of 1,000 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
GRENADA, Mississippi has 30 scored datacenter candidate sites averaging 51.3/100 DC Readiness, roughly in line with the Mississippi average of 53.0. It ranks 34th of 80 Mississippi counties by number of sites and 59th by average score. The top-scoring site is Substation-Adjacent site · dcb25ffb at 60.3/100.
Site-selection context for GRENADA
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
How does GRENADA compare with other counties in Mississippi?
By number of scored sites, GRENADA ranks 34th of the 80 Mississippi counties with a county page, holding 1.0% of the state's 3,104 sites. Its average DC Readiness of 51.3/100 ranks 59th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1271st-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 7 score 55 or higher.
What types of datacenter sites are in GRENADA?
Manufacturing sites are the most common (21, 70% of the county's inventory), followed by substation-adjacent (6) and federal excess (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in GRENADA?
Industrial electricity averages 9.02¢/kWh and commercial 12.71¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (45). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 2,400 cooling degree days a year with a mean temperature of 64°F. Land is valued around $2,691 an acre.
By site type
Top datacenter sites in GRENADA
Every scored site in GRENADA
All 30 sites, best first.
- Substation-Adjacent site · dcb25ffb · 60.3
- Substation-Adjacent site · e09dcce5 · 59.6
- EC FFE Grenada County · 56.3
- Substation-Adjacent site · f836b53f · 56.0
- Substation-Adjacent site · ba22ddef · 56.0
- Substation-Adjacent site · 195dba07 · 55.9
- Substation-Adjacent site · c75421a6 · 55.7
- THOMAS WOOD PRESERVING, INC. (WOOD PRESERVATION) · 50.1
- PIONEER COLD STORAGE WAREHOUSE CO. (MEAT PROCESSED FROM CARCASSES) · 50.1
- HANKINS LUMBER CO., INC. (SAWMILLS) · 50.1
- GEORGIA-PACIFIC LLC (CUT STOCK, RESAWING LUMBER, AND PLANING) · 50.1
- GOOD EARTH HORTICULTURE, INC. (CUT STOCK, RESAWING LUMBER, AND PLANING) · 50.1
- KOPPERS, INC. (CUT STOCK, RESAWING LUMBER, AND PLANING) · 50.1
- HEATCRAFT COILS-LUVATA (POWER BOILER AND HEAT EXCHANGER MANUFACTURING) · 50.0
- HANKINS LUMBER CO., INC., #2 (SAWMILLS) · 50.0
- VALLEY RACKS, INC. (OTHER FABRICATED WIRE PRODUCT MANUFACTURING) · 50.0
- BINSWANGER MIRROR (GLASS PRODUCT MANUFACTURING MADE OF PURCHASED GLASS) · 50.0
- SEALED AIR CORP. (ALL OTHER MISCELLANEOUS FOOD MANUFACTURING) · 49.3
- ABITIBIBOWATER, INC., NEWSPRINT SOUTH (NEWSPRINT MILLS) · 49.3
- GRENADA STAMPING & ASSEMBLY (METAL STAMPING) · 49.3
- LECLAIR INDUSTRIES, INC. (POLYSTYRENE FOAM PRODUCT MANUFACTURING) · 49.2
- GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING) · 49.2
- COOK PORTABLE WAREHOUSES, INC. (PREFABRICATED WOOD BUILDING MANUFACTURING) · 49.2
- HARRELL'S METAL WORKS (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING) · 49.2
- FLY TIMBER CO., INC. (SAWMILLS) · 49.2
- LUVATA GRENADA LLC (ELECTRONIC COIL, TRANSFORMER, AND OTHER INDUCTOR MANUFACTURING) · 49.2
- ADVANCED DISTRIBUTOR PRODUCTS (HEATING EQUIPMENT (EXCEPT WARM AIR FURNACES) MANUFACTURING) · 49.2
- SUBURBAN PLASTICS CO. (ALL OTHER PLASTICS PRODUCT MANUFACTURING) · 49.2
- Mine Site · 3142fb1a · 49.0
- HOLCOMB, MS · 14e20abe · 48.0
GRENADA datacenter FAQ
How many datacenter sites are in GRENADA?
30 scored datacenter candidate sites, averaging 51.3/100 DC Readiness. That is the 34th-most of 80 Mississippi counties with five or more sites.
What is the highest-scoring datacenter site in GRENADA?
Substation-Adjacent site · dcb25ffb scores 60.3/100 DC Readiness, the highest of the 30 scored sites in GRENADA (a substation-adjacent site).
Does GRENADA offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in GRENADA?
FEMA's National Risk Index rates GRENADA as "Relatively High" (score 45).
What are industrial electricity rates in GRENADA?
Average industrial electricity is 9.02¢/kWh and commercial is 12.71¢/kWh in GRENADA.
More in Mississippi
- All datacenter sites in Mississippi· 3,104 sites
- Operating datacenters in Mississippi
- Electric substations in Mississippi
- Hinds· 201 sites · avg 52.4
- Forrest County· 146 sites · avg 51.6
- DeSoto County· 137 sites · avg 55.9
- Jackson County· 132 sites · avg 53.6
- Lee County· 126 sites · avg 53.5
- Harrison County· 118 sites · avg 53.5
- Manufacturing sites in Mississippi
- Substation-Adjacent sites in Mississippi
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in GRENADA, Mississippi”, https://gridcensus.com/datacenter-sites/mississippi/grenada (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for GRENADA, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.