Skip to content
Gridcensus

GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING)

Manufacturing

GRENADA, Mississippi · MISO

DC Readiness
49.3
Fair / 100

At a glance

GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING) is a manufacturing datacenter candidate site in GRENADA, Mississippi, scoring 49.3/100 DC Readiness — 18th of 30 scored sites in the county. It sits in the MISO grid region and the ENTERGY MISSISSIPPI LLC service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

UtilityENTERGY MISSISSIPPI LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth59
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPC Spire Mississippi
IXP distance63.4 mi
Fiber providers5
Fiber coverage63.6%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterC Spire Mississippi
DC distance63.4 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.71¢/kWh
Industrial electricity9.02¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,691

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING) compare with other sites in GRENADA?

GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING) ranks 18th of 30 scored candidate sites in GRENADA. Its 49.3/100 is roughly in line with the county average of 51.4. It is roughly in line with the Mississippi average of 53.0 and roughly in line with the national average of 53.2.

Against the Mississippi average, its strongest sub-score is natural hazard (55 vs 54) and its weakest is power availability (30 vs 37). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING) to power, fiber and other datacenters?

The nearest located transmission bottleneck is Horn_Lake_Freeport_161kV_flo_Freeport_500_161kV_ (MISO), 83 miles away. For connectivity, the nearest internet exchange facility is C Spire Mississippi at 63.4 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is C Spire Mississippi, 63.4 miles away.

What are the flood, water and hazard risks at GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING)?

At the county level, FEMA's National Risk Index rates GRENADA "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
50
Fiber connectivity12%
68
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in GRENADA, ranked by DC Readiness.

Sites near GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110070Substation-Adjacent230 kV300 MW4.3 yrs60.4
UNKNOWN110071Substation-Adjacent230 kV300 MW4.3 yrs59.6
EC FFE Grenada CountyGreenfield——4.3 yrs56.4
UNKNOWN110069Substation-Adjacent115 kV100 MW4.3 yrs56.1
TAP144812Substation-Adjacent115 kV100 MW4.3 yrs56.0
UNKNOWN109984Substation-Adjacent161 kV100 MW4.3 yrs56.0
TAP169450Substation-Adjacent161 kV100 MW4.3 yrs55.8
VALLEY RACKS, INC. (OTHER FABRICATED WIRE PRODUCT MANUFACTURING)Manufacturing——4.3 yrs50.1

GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING): common questions

What is the DC Readiness score of GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING)?

GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING) scores 49.3/100 on the GridCensus DC Readiness scale, rated fair. It ranks 18th of 30 scored sites in GRENADA. The GRENADA average is 51.4 and the Mississippi average is 53.0.

Which electric utility serves GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING)?

ENTERGY MISSISSIPPI LLC (investor owned) holds the retail service territory that contains the site; its holding company is ENTERGY CORP.

What grid region is GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING) in?

GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING) is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING) from an internet exchange?

The nearest internet exchange facility is C Spire Mississippi, about 63.4 miles away; 5 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING), GRENADA, MS”, https://gridcensus.com/datacenter-sites/mississippi/grenada/grenada-lake-herald-other-commercial-printing-bcfbbbd2 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for GRENADA LAKE HERALD (OTHER COMMERCIAL PRINTING), GRENADA is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.