Datacenter Sites in FRANKLIN, Mississippi
FRANKLIN has 14 scored datacenter candidate sites averaging 53.4/100 DC Readiness, with a catalogued aggregate of 1,800 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
14
Candidate sites
53.4/100
Avg DC Readiness
1,800 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for FRANKLIN
Yessales_tax_exemption
Datacenter tax incentive
13.63¢/kWh
Commercial electricity
8.76¢/kWh
Industrial electricity
3
Fiber providers
Low
Water stress
$3,207
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
By site type
Top datacenter sites in FRANKLIN
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Greenfield (FRANKLIN - GRAND GULF) | Greenfield | 500 kV | 1,000 MW | 1.4 yrs | 64.8 |
| TAP142767 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 61.3 |
| TAP143094 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 61.1 |
| UNKNOWN110840 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 60.1 |
| UNKNOWN110841 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 59.3 |
| Greenfield (UNKNOWN110840 - FRANKLIN) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 55.5 |
| EC FFE Franklin County | Greenfield | — | — | 1.4 yrs | 55.3 |
| Greenfield (UNKNOWN110840 - FRANKLIN) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 53.6 |
| Greenfield (UNKNOWN110840 - UNKNOWN110841) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 52.0 |
| Greenfield (UNKNOWN110840 - UNKNOWN110841) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 50.4 |
| FRANKLIN TIMBER CO. (SAWMILLS) | Manufacturing | — | — | — | 45.4 |
| SMITH BROS. LOGGING, INC. (SAWMILLS) | Manufacturing | — | — | — | 45.4 |
| ALFORD LUMBER CO., INC. (CUT STOCK, RESAWING LUMBER, AND PLANING) | Manufacturing | — | — | — | 45.4 |
| Mine Site | Former Mine | — | — | — | 38.6 |
FRANKLIN datacenter FAQ
- How many datacenter sites are in FRANKLIN?
- 14 scored datacenter candidate sites, averaging 53.4/100 DC Readiness.
- Does FRANKLIN offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
- What is the natural-hazard risk in FRANKLIN?
- FEMA's National Risk Index rates FRANKLIN as "Relatively High" (score 45).
- What are industrial electricity rates in FRANKLIN?
- Average industrial electricity is 8.76¢/kWh and commercial is 13.63¢/kWh in FRANKLIN.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for FRANKLIN, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.