Mine Site
Former MineFRANKLIN, Mississippi · MISO
Mine Site is a former mine datacenter candidate site in FRANKLIN, Mississippi, interconnecting through MISO. It screens at 49.3/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in FRANKLIN, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC FFE Franklin County | Greenfield | — | — | 1.4 yrs | 55.9 |
| UNKNOWN110840 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 51.5 |
| TAP142767 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 51.5 |
| UNKNOWN110841 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 51.5 |
| FRANKLIN TIMBER CO. (SAWMILLS) | Manufacturing | — | — | 3.5 yrs | 49.1 |
| ALFORD LUMBER CO., INC. (CUT STOCK, RESAWING LUMBER, AND PLANING) | Manufacturing | — | — | 3.5 yrs | 48.9 |
| SMITH BROS. LOGGING, INC. (SAWMILLS) | Manufacturing | — | — | 3.5 yrs | 48.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Mine Site, FRANKLIN. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.