CLARKE has 29 scored datacenter candidate sites averaging 53.1/100 DC Readiness, with a catalogued aggregate of 1,300 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

CLARKE, Mississippi has 29 scored datacenter candidate sites averaging 53.1/100 DC Readiness, roughly in line with the Mississippi average of 53.0. It ranks 37th of 80 Mississippi counties by number of sites and 37th by average score. The top-scoring site is Substation-Adjacent site · 1d6c2311 at 61.9/100.

29
Candidate sites
53.1/100
Avg DC Readiness
1,300 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in CLARKE

Site-selection context for CLARKE

Yessales_tax_exemption
Datacenter tax incentive
12.23¢/kWh
Commercial electricity
7.72¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$3,758
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

How does CLARKE compare with other counties in Mississippi?

By number of scored sites, CLARKE ranks 37th of the 80 Mississippi counties with a county page, holding 0.9% of the state's 3,104 sites. Its average DC Readiness of 53.1/100 ranks 37th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1305th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 7 score 55 or higher.

What types of datacenter sites are in CLARKE?

Industrial sites are the most common (12, 41% of the county's inventory), followed by manufacturing (8) and substation-adjacent (6). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in CLARKE?

Industrial electricity averages 7.72¢/kWh and commercial 12.23¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (45). WRI water stress is low. 7 fiber providers report service in the county. The climate runs 2,400 cooling degree days a year with a mean temperature of 64°F. Land is valued around $3,758 an acre.

By site type

Top datacenter sites in CLARKE

Top datacenter sites in CLARKE
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109552Substation-Adjacent230 kV300 MW3.9 yrs61.9
UNKNOWN109551Substation-Adjacent230 kV300 MW3.9 yrs61.2
UNKNOWN109612Substation-Adjacent115 kV100 MW3.9 yrs57.5
UNKNOWN109613Substation-Adjacent115 kV100 MW3.9 yrs57.4
UNKNOWN109971Substation-Adjacent115 kV100 MW3.9 yrs57.4
UNKNOWN109553Substation-Adjacent115 kV100 MW3.9 yrs57.3
Greenfield (UNKNOWN109403 - WAYNESBORO)Greenfield230 kV300 MW3.9 yrs55.2
ALAMISS ENTERPRISES INC. (LOGGING)Manufacturing——3.9 yrs51.6
FC Meyer PackagingIndustrial——3.9 yrs51.6
ODOM INDUSTRIES, INC. (PESTICIDE AND OTHER AGRICULTURAL CHEMICAL MANUFACTURING)Manufacturing——3.9 yrs51.6
Miller OilIndustrial——3.9 yrs51.6
101 Church StreetIndustrial——3.9 yrs51.6
DART CONTAINER CORPORATION (POLYSTYRENE FOAM PRODUCT MANUFACTURING)Manufacturing——3.9 yrs51.6
Senior Center SiteIndustrial——3.9 yrs51.6
MISSISSIPPI FINE PRODUCTS, INC. (CORRUGATED AND SOLID FIBER BOX MANUFACTURING)Manufacturing——3.9 yrs51.6
Blair BuildingIndustrial——3.9 yrs51.6
MAFCOTE INDUSTRIES, INC. (WOOD CONTAINER AND PALLET MANUFACTURING)Manufacturing——3.9 yrs51.6
USA FabricsIndustrial——3.9 yrs51.6
U.S.A. FABRICS, INC. (NOT AVAILABLE)Manufacturing——3.9 yrs51.6
SykesIndustrial——3.9 yrs51.6
Quitman City HallIndustrial——3.9 yrs51.6
MISSISSIPPI LAMINATORS, INC. (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING)Manufacturing——3.9 yrs51.5
KELWOOD PRODUCTS, INC. (SAWMILLS)Manufacturing——3.9 yrs51.5
Enterprise Service StationIndustrial——3.9 yrs51.5
Workforce Training SiteIndustrial——3.9 yrs51.4

Every scored site in CLARKE

All 29 sites, best first.

CLARKE datacenter FAQ

How many datacenter sites are in CLARKE?

29 scored datacenter candidate sites, averaging 53.1/100 DC Readiness. That is the 37th-most of 80 Mississippi counties with five or more sites.

What is the highest-scoring datacenter site in CLARKE?

Substation-Adjacent site · 1d6c2311 scores 61.9/100 DC Readiness, the highest of the 29 scored sites in CLARKE (a substation-adjacent site).

Does CLARKE offer datacenter tax incentives?

Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

What is the natural-hazard risk in CLARKE?

FEMA's National Risk Index rates CLARKE as "Relatively High" (score 45).

What are industrial electricity rates in CLARKE?

Average industrial electricity is 7.72¢/kWh and commercial is 12.23¢/kWh in CLARKE.

More in Mississippi

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in CLARKE, Mississippi”, https://gridcensus.com/datacenter-sites/mississippi/clarke (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for CLARKE, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.