Skip to content
Gridcensus

Senior Center Site

Industrial

CLARKE, Mississippi · MISO

DC Readiness
49.8
Fair / 100

Senior Center Site is an industrial datacenter candidate site in CLARKE, Mississippi, interconnecting through MISO. It screens at 49.8/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityMISSISSIPPI POWER COinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth59
Avg queue wait2.8 yrs

Connectivity

Nearest IXPC Spire Mississippi
IXP distance111.6 mi
Fiber providers7
Fiber coverage86.7%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterAmazon Web Services
DC distance95.2 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.23¢/kWh
Industrial electricity7.72¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,758

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Senior Center Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
49
Fiber connectivity12%
74
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in CLARKE, ranked by DC Readiness.

Sites near Senior Center Site
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109552Substation-Adjacent230 kV300 MW2.8 yrs60.1
UNKNOWN109551Substation-Adjacent230 kV300 MW2.8 yrs59.4
UNKNOWN109612Substation-Adjacent115 kV100 MW2.8 yrs55.7
UNKNOWN109613Substation-Adjacent115 kV100 MW2.8 yrs55.6
UNKNOWN109971Substation-Adjacent115 kV100 MW2.8 yrs55.6
UNKNOWN109553Substation-Adjacent115 kV100 MW2.8 yrs55.5
Greenfield (UNKNOWN109403 - WAYNESBORO)Greenfield230 kV300 MW2.8 yrs53.4
ODOM INDUSTRIES, INC. (PESTICIDE AND OTHER AGRICULTURAL CHEMICAL MANUFACTURING)Manufacturing3.5 yrs50.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Senior Center Site, CLARKE. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.