Datacenter Sites in Todd, Kentucky

Todd has 11 scored datacenter candidate sites averaging 57.9/100 DC Readiness, with a catalogued aggregate of 150 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Todd, Kentucky has 11 scored datacenter candidate sites averaging 57.9/100 DC Readiness, about 12% above the Kentucky average of 51.8. It ranks 94th of 117 Kentucky counties by number of sites and 14th by average score. The top-scoring site is EC FFE Todd County at 63.7/100.

11
Candidate sites
57.9/100
Avg DC Readiness
150 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 11 in Todd

Site-selection context for Todd

Yessales_tax_exemption
Datacenter tax incentive
10.85¢/kWh
Commercial electricity
5.48¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$6,606
Land price / acre
1,300
Cooling degree days
4,300
Heating degree days
56°F
Mean annual temp

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

How does Todd compare with other counties in Kentucky?

By number of scored sites, Todd ranks 94th of the 117 Kentucky counties with a county page, holding 0.1% of the state's 7,741 sites. Its average DC Readiness of 57.9/100 ranks 14th in the state and is roughly in line with the national average of 53.0. Nationally it has the 2327th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 11 score 55 or higher.

What types of datacenter sites are in Todd?

Shovel-Ready sites are the most common (5, 45% of the county's inventory), followed by greenfield (3) and substation-adjacent (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Todd?

Industrial electricity averages 5.48¢/kWh and commercial 10.85¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 56°F. Land is valued around $6,606 an acre.

By site type

Top datacenter sites in Todd

Top datacenter sites in Todd
SiteTypeVoltageCapacityQueue waitScore
EC FFE Todd CountyGreenfield——3.9 yrs63.7
OZ ToddGreenfield——3.9 yrs60.9
ELKTONSubstation-Adjacent69 kV50 MW3.9 yrs60.3
Latham Site - ElktonShovel-Ready——3.9 yrs57.2
Warren Property - Site 219-024Shovel-Ready——3.9 yrs57.1
Guthrie Rail Site 219-012Shovel-Ready——3.9 yrs56.9
Mine SiteFormer Mine——3.9 yrs56.6
Elkton Die CastingIndustrial——3.9 yrs56.3
Elkton - Rose SiteShovel-Ready——3.9 yrs56.2
Robertson Property -- Elkton Site 219-023Shovel-Ready——3.9 yrs56.2
Greenfield (TAP155101 - TAP155281)Greenfield161 kV100 MW3.9 yrs55.5

Every scored site in Todd

All 11 sites, best first.

Todd datacenter FAQ

How many datacenter sites are in Todd?

11 scored datacenter candidate sites, averaging 57.9/100 DC Readiness. That is the 94th-most of 117 Kentucky counties with five or more sites.

What is the highest-scoring datacenter site in Todd?

EC FFE Todd County scores 63.7/100 DC Readiness, the highest of the 11 scored sites in Todd (a greenfield site).

Does Todd offer datacenter tax incentives?

Sales tax exemption on electricity for large industrial users; KBI tax credits.

What is the natural-hazard risk in Todd?

FEMA's National Risk Index rates Todd as "Relatively Moderate" (score 30).

What are industrial electricity rates in Todd?

Average industrial electricity is 5.48¢/kWh and commercial is 10.85¢/kWh in Todd.

More in Kentucky

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Todd, Kentucky”, https://gridcensus.com/datacenter-sites/kentucky/todd (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Todd, Kentucky is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.