EC FFE Todd County

Greenfield

Todd, Kentucky · PJM

DC Readiness
58.9
Good / 100

EC FFE Todd County is a greenfield datacenter candidate site in Todd, Kentucky, interconnecting through PJM. It screens at 58.9/100 DC Readiness and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.11¢/kWh
UtilityPENNYRILE RURAL ELECTRIC COOPcooperativemoderate to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 4.7 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth175
Avg queue wait3.6 yrs
Recent queue wait4.7 yrs
Completion rate7%
Withdrawal rate93%

Connectivity

Nearest IXPEnergynet Datacenter
IXP distance15.8 mi
Fiber providers5
Fiber coverage99.6%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance312.8 mi

Site characteristics

Site typeGreenfield
Land contactTodd County County Assessor
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay
Former usefossil fuel employment

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.40
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index84.6 (avg 100)

Location context

Nearest datacenterGoogle Montgomery Data Center
DC distance15.0 mi
Nearest rail9.0 mi
Nearest gas pipeline5.5 mi
Nearest fiber route163.1 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.85¢/kWh
Industrial electricity5.48¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$6,606

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC FFE Todd County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
33
Fiber connectivity12%
78
Energy cost10%
86
Water risk7%
89
Natural hazard6%
70
Buildability7%
75
Labor market4%
50
DC cluster4%
80
Land / acreage3%
62
Construction cost3%
80
Gas pipeline2%
82
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Todd, ranked by DC Readiness.

Sites near EC FFE Todd County
SiteTypeVoltageCapacityQueue waitScore
Mine SiteFormer Mine1.0 yrs59.4
Greenfield (TAP155101 - TAP155281)Greenfield161 kV100 MW1.0 yrs58.3
ELKTONSubstation-Adjacent69 kV50 MW3.8 yrs56.3
OZ ToddGreenfield3.6 yrs56.1
Latham Site - ElktonShovel-Ready3.8 yrs53.2
Warren Property - Site 219-024Shovel-Ready3.8 yrs53.1
Guthrie Rail Site 219-012Shovel-Ready3.8 yrs53.0
Elkton Die CastingIndustrial3.8 yrs52.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.