Skip to content
Gridcensus

Guthrie Rail Site 219-012

Shovel-Ready

Todd, Kentucky · PJM

DC Readiness
53.0
Fair / 100

Guthrie Rail Site 219-012 is a shovel-ready datacenter candidate site in Todd, Kentucky, interconnecting through PJM. It screens at 53.0/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityPENNYRILE RURAL ELECTRIC COOPcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth175
Avg queue wait3.8 yrs

Connectivity

Nearest IXPRussellvile EPB Smartnet
IXP distance20.2 mi
Fiber providers5
Fiber coverage99.6%

Site characteristics

Site typeShovel-Ready
Acreage204 ac
Buildable load (est.)~82204 MWland-based
Land contactTodd County Assessor
Former useShovel-ready

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterGoogle Montgomery Data Center
DC distance5.4 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.85¢/kWh
Industrial electricity5.48¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$6,606

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Guthrie Rail Site 219-012

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
37
Fiber connectivity12%
83
Energy cost10%
50
Water risk7%
92
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
62
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Todd, ranked by DC Readiness.

Sites near Guthrie Rail Site 219-012
SiteTypeVoltageCapacityQueue waitScore
Mine SiteFormer Mine1.0 yrs59.4
EC FFE Todd CountyGreenfield3.6 yrs58.9
Greenfield (TAP155101 - TAP155281)Greenfield161 kV100 MW1.0 yrs58.3
ELKTONSubstation-Adjacent69 kV50 MW3.8 yrs56.3
OZ ToddGreenfield3.6 yrs56.1
Latham Site - ElktonShovel-Ready3.8 yrs53.2
Warren Property - Site 219-024Shovel-Ready3.8 yrs53.1
Elkton Die CastingIndustrial3.8 yrs52.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Guthrie Rail Site 219-012, Todd. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.