Stanton has 16 scored datacenter candidate sites averaging 54.3/100 DC Readiness, with a catalogued aggregate of 704 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Stanton, Kansas has 16 scored datacenter candidate sites averaging 54.3/100 DC Readiness, roughly in line with the Kansas average of 53.6. It ranks 46th of 90 Kansas counties by number of sites and 26th by average score. The top-scoring site is EC Near Johnson · 263cd9e6 at 58.3/100.

16
Candidate sites
54.3/100
Avg DC Readiness
704 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 16 in Stanton

Site-selection context for Stanton

Yesproperty_tax_exemption
Datacenter tax incentive
8.95¢/kWh
Commercial electricity
5.94¢/kWh
Industrial electricity
1
Fiber providers
Medium-High
Water stress
$1,446
Land price / acre
1,400
Cooling degree days
5,000
Heating degree days
55°F
Mean annual temp

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

How does Stanton compare with other counties in Kansas?

By number of scored sites, Stanton ranks 46th of the 90 Kansas counties with a county page, holding 0.7% of the state's 2,352 sites. Its average DC Readiness of 54.3/100 ranks 26th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1960th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 7 score 55 or higher.

What types of datacenter sites are in Stanton?

Greenfield sites are the most common (10, 63% of the county's inventory), followed by substation-adjacent (5) and brownfield (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Stanton?

Industrial electricity averages 5.94¢/kWh and commercial 8.95¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (35). WRI water stress is medium-high. 1 fiber providers report service in the county. The climate runs 1,400 cooling degree days a year with a mean temperature of 55°F. Land is valued around $1,446 an acre.

By site type

Top datacenter sites in Stanton

Top datacenter sites in Stanton
SiteTypeVoltageCapacityQueue waitScore
EC Near JohnsonGreenfield——4.3 yrs58.3
EC Near JohnsonGreenfield——4.3 yrs58.0
JohnsonBrownfield115 kV4 MW4.3 yrs57.9
EC Near JohnsonGreenfield——4.3 yrs56.1
EC Near JohnsonGreenfield——4.3 yrs56.0
UNKNOWN119526Substation-Adjacent115 kV100 MW4.3 yrs55.1
EC Near JohnsonGreenfield——4.3 yrs55.0
EC Near JohnsonGreenfield——4.3 yrs54.9
TAP148898Substation-Adjacent115 kV100 MW4.3 yrs54.7
UNKNOWN119533Substation-Adjacent115 kV100 MW4.3 yrs54.7
UNKNOWN119524Substation-Adjacent115 kV100 MW4.3 yrs54.7
TAP148897Substation-Adjacent115 kV100 MW4.3 yrs54.5
EC Near JohnsonGreenfield——4.3 yrs51.4
EC Near JohnsonGreenfield——4.3 yrs50.9
Greenfield (UNKNOWN119526 - TAP148898)Greenfield115 kV100 MW4.3 yrs48.3
Greenfield (UNKNOWN119524 - TAP148884)Greenfield115 kV100 MW4.3 yrs48.2

Every scored site in Stanton

All 16 sites, best first.

Stanton datacenter FAQ

How many datacenter sites are in Stanton?

16 scored datacenter candidate sites, averaging 54.3/100 DC Readiness. That is the 46th-most of 90 Kansas counties with five or more sites.

What is the highest-scoring datacenter site in Stanton?

EC Near Johnson · 263cd9e6 scores 58.3/100 DC Readiness, the highest of the 16 scored sites in Stanton (a greenfield site).

Does Stanton offer datacenter tax incentives?

PEAK program payroll tax incentives; IRB property tax exemptions available.

What is the natural-hazard risk in Stanton?

FEMA's National Risk Index rates Stanton as "Relatively High" (score 35).

What are industrial electricity rates in Stanton?

Average industrial electricity is 5.94¢/kWh and commercial is 8.95¢/kWh in Stanton.

More in Kansas

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Stanton, Kansas”, https://gridcensus.com/datacenter-sites/kansas/stanton (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Stanton, Kansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.