TAP148897 is a substation-adjacent datacenter candidate site in Stanton, Kansas, interconnecting through SPP. It screens at 54.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP148897
Nearest grid bottleneckTP1241_33286 · 131 km (SPP)
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityPIONEER ELECTRIC COOP, INC - (KS)cooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth64
Avg queue wait3.3 yrs

Connectivity

Fiber providers1
Fiber coverage79.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity8.95¢/kWh
Industrial electricity5.94¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$1,446

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP148897

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
54
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
52
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
10
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Stanton, ranked by DC Readiness.

Sites near TAP148897
SiteTypeVoltageCapacityQueue waitScore
EC Near JohnsonGreenfield——3.5 yrs59.3
EC Near JohnsonGreenfield——3.5 yrs59.0
JohnsonBrownfield115 kV4 MW3.5 yrs58.5
EC Near JohnsonGreenfield——3.5 yrs57.1
EC Near JohnsonGreenfield——3.5 yrs57.0
EC Near JohnsonGreenfield——3.5 yrs56.0
EC Near JohnsonGreenfield——3.5 yrs55.9
UNKNOWN119526Substation-Adjacent115 kV100 MW3.3 yrs55.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.