Datacenter Sites in Reno, Kansas
Reno has 40 scored datacenter candidate sites averaging 54.0/100 DC Readiness, with a catalogued aggregate of 2,450 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
Reno, Kansas has 40 scored datacenter candidate sites averaging 54.0/100 DC Readiness, roughly in line with the Kansas average of 53.6. It ranks 14th of 90 Kansas counties by number of sites and 34th by average score. The top-scoring site is Substation-Adjacent site · dad156a9 at 61.4/100.
Site-selection context for Reno
Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.
How does Reno compare with other counties in Kansas?
By number of scored sites, Reno ranks 14th of the 90 Kansas counties with a county page, holding 1.7% of the state's 2,352 sites. Its average DC Readiness of 54.0/100 ranks 34th in the state and is roughly in line with the national average of 53.0. Nationally it has the 969th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 19 score 55 or higher.
What types of datacenter sites are in Reno?
Substation-Adjacent sites are the most common (17, 43% of the county's inventory), followed by greenfield (12) and industrial (10). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Reno?
Industrial electricity averages 8.41¢/kWh and commercial 10.97¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (35). WRI water stress is medium-high. 6 fiber providers report service in the county. The climate runs 1,400 cooling degree days a year with a mean temperature of 55°F. Land is valued around $2,641 an acre.
By site type
Top datacenter sites in Reno
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN118040 | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 61.4 |
| RENO | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 61.3 |
| OZ Reno | Greenfield | — | — | 4.3 yrs | 60.2 |
| EC Near Hutchinson Energy Center | Greenfield | — | — | 4.3 yrs | 59.1 |
| EC Near Hutchinson Energy Center | Greenfield | — | — | 4.3 yrs | 58.7 |
| EC Near Hutchinson Energy Center | Greenfield | — | — | 4.3 yrs | 57.7 |
| EC Near Hutchinson Energy Center | Greenfield | — | — | 4.3 yrs | 57.7 |
| EC Near Hutchinson Energy Center | Greenfield | — | — | 4.3 yrs | 57.5 |
| EC Near Hutchinson Energy Center | Greenfield | — | — | 4.3 yrs | 57.1 |
| TAP138841 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 56.2 |
| EC Near Hutchinson Energy Center | Greenfield | — | — | 4.3 yrs | 55.8 |
| UNKNOWN119865 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.7 |
| UNKNOWN119867 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.4 |
| EC Near Hutchinson Energy Center | Greenfield | — | — | 4.3 yrs | 55.4 |
| UNKNOWN172444 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.4 |
| UNKNOWN118026 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.3 |
| UNKNOWN119868 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.2 |
| UNKNOWN119866 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.2 |
| UNKNOWN118038 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.1 |
| EC Near Hutchinson Energy Center | Greenfield | — | — | 4.3 yrs | 54.3 |
| TAP168677 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 53.4 |
| UNKNOWN119895 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 53.4 |
| TAP168681 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 53.4 |
| TAP168676 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 53.4 |
| TAP168680 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 53.3 |
Every scored site in Reno
All 40 sites, best first.
- Substation-Adjacent site · dad156a9 · 61.4
- RENO · 61.3
- OZ Reno · 60.2
- EC Near Hutchinson Energy Center · 0b8e1fbb · 59.1
- EC Near Hutchinson Energy Center · 01bd9e8d · 58.7
- EC Near Hutchinson Energy Center · a250f30b · 57.7
- EC Near Hutchinson Energy Center · efb2676d · 57.7
- EC Near Hutchinson Energy Center · b2e64581 · 57.5
- EC Near Hutchinson Energy Center · 6a04a8e7 · 57.1
- Substation-Adjacent site · 7c6c325c · 56.2
- EC Near Hutchinson Energy Center · 08ce33d6 · 55.8
- Substation-Adjacent site · bba6394a · 55.7
- Substation-Adjacent site · ae65f303 · 55.4
- EC Near Hutchinson Energy Center · 0d2f6c2b · 55.4
- Substation-Adjacent site · f90668ed · 55.4
- Substation-Adjacent site · 095f0653 · 55.3
- Substation-Adjacent site · 94013052 · 55.2
- Substation-Adjacent site · 1954c30b · 55.2
- Substation-Adjacent site · be56652a · 55.1
- EC Near Hutchinson Energy Center · e7ecfad0 · 54.3
- Substation-Adjacent site · 100291e2 · 53.4
- Substation-Adjacent site · f445bed6 · 53.4
- Substation-Adjacent site · 5ca2d664 · 53.4
- Substation-Adjacent site · c44fd1ed · 53.4
- Substation-Adjacent site · 0f627437 · 53.3
- Greenfield (UNKNOWN118040 - UNKNOWN118044) · 53.3
- Substation-Adjacent site · 95fec4c9 · 53.3
- Substation-Adjacent site · 391d4ef9 · 53.3
- Liberty Homes BTA · 50.2
- Lighthouse Landing Rv Park BTA · 50.1
- Mine Site · 7c1f3487 · 49.6
- Proposed PrairieStar Health Care Center · 49.4
- Former Pride Transportation · 49.4
- South Hutchinson Residential Subdivision · 49.4
- Midwest Iron · 49.4
- City of Hutchinson - Stamey Lofts · 49.4
- Hutchinson Mobile Home Park · 49.4
- Countryside Lanes BTA · 49.3
- Gregory South BTA · 49.1
- Greenfield (UNKNOWN118038 - UNKNOWN119865) · 48.8
Reno datacenter FAQ
How many datacenter sites are in Reno?
40 scored datacenter candidate sites, averaging 54.0/100 DC Readiness. That is the 14th-most of 90 Kansas counties with five or more sites.
What is the highest-scoring datacenter site in Reno?
Substation-Adjacent site · dad156a9 scores 61.4/100 DC Readiness, the highest of the 40 scored sites in Reno (a substation-adjacent site).
Does Reno offer datacenter tax incentives?
PEAK program payroll tax incentives; IRB property tax exemptions available.
What is the natural-hazard risk in Reno?
FEMA's National Risk Index rates Reno as "Relatively High" (score 35).
What are industrial electricity rates in Reno?
Average industrial electricity is 8.41¢/kWh and commercial is 10.97¢/kWh in Reno.
More in Kansas
- All datacenter sites in Kansas· 2,352 sites
- Operating datacenters in Kansas
- Electric substations in Kansas
- Sedgwick· 273 sites · avg 53.9
- Wyandotte· 153 sites · avg 56.9
- Shawnee County· 77 sites · avg 52.1
- Montgomery County· 76 sites · avg 50.4
- Johnson County· 63 sites · avg 59.3
- Bourbon County· 60 sites · avg 49.6
- Substation-Adjacent sites in Kansas
- Greenfield sites in Kansas
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Reno, Kansas”, https://gridcensus.com/datacenter-sites/kansas/reno (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Reno, Kansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.