At a glance

Midwest Iron is an industrial datacenter candidate site in Reno, Kansas, scoring 49.4/100 DC Readiness — 31st of 40 scored sites in the county. It sits in the SPP grid region and the EVERGY KANSAS CENTRAL, INC service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

Nearest grid bottleneckTP1136_32015 · 52 km (SPP)
UtilityEVERGY KANSAS CENTRAL, INCinvestor ownedfavorable to large load · terms ≥ 75 MWLarge Load Power Service (LLPS, ≥75 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth59
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPBeloit-NOC
IXP distance97.4 mi
Fiber providers6
Fiber coverage84.3%

Site characteristics

Site typeIndustrial
Land contactReno County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterSC DC
DC distance64.7 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity10.97¢/kWh
Industrial electricity8.41¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$2,641

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Midwest Iron

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Midwest Iron compare with other sites in Reno?

Midwest Iron ranks 31st of 40 scored candidate sites in Reno. Its 49.4/100 is roughly in line with the county average of 54.0. It is roughly in line with the Kansas average of 53.2 and roughly in line with the national average of 53.2.

Against the Kansas average, its strongest sub-score is fiber connectivity (74 vs 71) and its weakest is power availability (30 vs 38). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Midwest Iron to power, fiber and other datacenters?

The nearest located transmission bottleneck is TP1136_32015 (SPP), 32 miles away. For connectivity, the nearest internet exchange facility is Beloit-NOC at 97.4 miles. 6 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is SC DC, 64.7 miles away.

What are the flood, water and hazard risks at Midwest Iron?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates Reno "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
55
Fiber connectivity12%
74
Energy cost10%
50
Water risk7%
52
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Reno, ranked by DC Readiness.

Sites near Midwest Iron
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN118040Substation-Adjacent230 kV300 MW4.3 yrs61.4
RENOSubstation-Adjacent345 kV600 MW4.3 yrs61.3
OZ RenoGreenfield——4.3 yrs60.2
EC Near Hutchinson Energy CenterGreenfield——4.3 yrs59.1
EC Near Hutchinson Energy CenterGreenfield——4.3 yrs58.7
EC Near Hutchinson Energy CenterGreenfield——4.3 yrs57.7
EC Near Hutchinson Energy CenterGreenfield——4.3 yrs57.7
EC Near Hutchinson Energy CenterGreenfield——4.3 yrs57.5

Midwest Iron: common questions

What is the DC Readiness score of Midwest Iron?

Midwest Iron scores 49.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 31st of 40 scored sites in Reno. The Reno average is 54.0 and the Kansas average is 53.2.

Which electric utility serves Midwest Iron?

EVERGY KANSAS CENTRAL, INC (investor owned) holds the retail service territory that contains the site; its holding company is WESTAR ENERGY INC.

What grid region is Midwest Iron in?

Midwest Iron is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Is Midwest Iron in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

How far is Midwest Iron from an internet exchange?

The nearest internet exchange facility is Beloit-NOC, about 97.4 miles away; 6 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Midwest Iron, Reno, KS”, https://gridcensus.com/datacenter-sites/kansas/reno/midwest-iron-20349b8c (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Midwest Iron, Reno is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.