Datacenter Sites in Miami, Kansas

Miami has 35 scored datacenter candidate sites averaging 55.8/100 DC Readiness, with a catalogued aggregate of 507 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Miami, Kansas has 35 scored datacenter candidate sites averaging 55.8/100 DC Readiness, roughly in line with the Kansas average of 53.6. It ranks 17th of 90 Kansas counties by number of sites and 9th by average score. The top-scoring site is EC Near Osawatomie · 86cb4afa at 61.3/100.

35
Candidate sites
55.8/100
Avg DC Readiness
507 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Miami

Site-selection context for Miami

Yesproperty_tax_exemption
Datacenter tax incentive
10.75¢/kWh
Commercial electricity
9.74¢/kWh
Industrial electricity
12
Fiber providers
Medium-High
Water stress
$4,190
Land price / acre
1,400
Cooling degree days
5,000
Heating degree days
55°F
Mean annual temp

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

How does Miami compare with other counties in Kansas?

By number of scored sites, Miami ranks 17th of the 90 Kansas counties with a county page, holding 1.5% of the state's 2,352 sites. Its average DC Readiness of 55.8/100 ranks 9th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1101st-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 23 score 55 or higher.

What types of datacenter sites are in Miami?

Greenfield sites are the most common (20, 57% of the county's inventory), followed by industrial (9) and substation-adjacent (4). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Miami?

Industrial electricity averages 9.74¢/kWh and commercial 10.75¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (35). WRI water stress is medium-high. 12 fiber providers report service in the county. The climate runs 1,400 cooling degree days a year with a mean temperature of 55°F. Land is valued around $4,190 an acre.

By site type

Top datacenter sites in Miami

Top datacenter sites in Miami
SiteTypeVoltageCapacityQueue waitScore
EC Near OsawatomieGreenfield——4.3 yrs61.3
UNKNOWN173427Substation-Adjacent161 kV100 MW4.3 yrs61.1
EC Near OsawatomieGreenfield——4.3 yrs59.8
EC Near OsawatomieGreenfield——4.3 yrs59.8
EC Near OsawatomieGreenfield——4.3 yrs59.5
UNKNOWN118176Substation-Adjacent161 kV100 MW4.3 yrs59.5
EC Near OsawatomieGreenfield——4.3 yrs59.0
EC Near OsawatomieGreenfield——4.3 yrs59.0
EC Near OsawatomieGreenfield——4.3 yrs58.5
EC Near OsawatomieGreenfield——4.3 yrs58.2
EC Near Osawatomie City ofGreenfield——4.3 yrs58.1
Osawatomie City ofBrownfield—7 MW4.3 yrs57.9
UNKNOWN118172Substation-Adjacent161 kV100 MW4.3 yrs57.7
EC Near OsawatomieGreenfield——4.3 yrs57.3
EC Near Osawatomie City ofGreenfield——4.3 yrs57.3
UNKNOWN118133Substation-Adjacent161 kV100 MW4.3 yrs57.3
EC Coal Miami CountyGreenfield——4.3 yrs57.2
EC Near Osawatomie City ofGreenfield——4.3 yrs57.2
EC Near Osawatomie City ofGreenfield——4.3 yrs57.1
EC Near OsawatomieGreenfield——4.3 yrs57.1
EC Near Osawatomie City ofGreenfield——4.3 yrs57.0
EC Near Osawatomie City ofGreenfield——4.3 yrs56.7
OZ MiamiGreenfield——4.3 yrs55.1
EC Near OsawatomieGreenfield——4.3 yrs53.4
Greenfield (UNKNOWN118133 - WEST GARDNER)Greenfield161 kV100 MW4.3 yrs51.7

Every scored site in Miami

All 35 sites, best first.

Miami datacenter FAQ

How many datacenter sites are in Miami?

35 scored datacenter candidate sites, averaging 55.8/100 DC Readiness. That is the 17th-most of 90 Kansas counties with five or more sites.

What is the highest-scoring datacenter site in Miami?

EC Near Osawatomie · 86cb4afa scores 61.3/100 DC Readiness, the highest of the 35 scored sites in Miami (a greenfield site).

Does Miami offer datacenter tax incentives?

PEAK program payroll tax incentives; IRB property tax exemptions available.

What is the natural-hazard risk in Miami?

FEMA's National Risk Index rates Miami as "Relatively High" (score 35).

What are industrial electricity rates in Miami?

Average industrial electricity is 9.74¢/kWh and commercial is 10.75¢/kWh in Miami.

More in Kansas

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Miami, Kansas”, https://gridcensus.com/datacenter-sites/kansas/miami (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Miami, Kansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.