Claud Davis Engraving BTA

Industrial

Miami, Kansas · SPP

DC Readiness
50.8
Fair / 100

At a glance

Claud Davis Engraving BTA is an industrial datacenter candidate site in Miami, Kansas, scoring 50.8/100 DC Readiness — 29th of 35 scored sites in the county. It sits in the SPP grid region and the HEARTLAND RURAL ELEC COOP, INC service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

Nearest grid bottleneckTMP338_28287 · 34 km (SPP)
UtilityHEARTLAND RURAL ELEC COOP, INCnot available

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth59
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPQTS Overland Park (OVP1)
IXP distance27.4 mi
Fiber providers12
Fiber coverage67.5%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterQTS Overland Park (OVP1)
DC distance27.4 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity10.75¢/kWh
Industrial electricity9.74¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$4,190

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Claud Davis Engraving BTA

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Claud Davis Engraving BTA compare with other sites in Miami?

Claud Davis Engraving BTA ranks 29th of 35 scored candidate sites in Miami. Its 50.8/100 is roughly in line with the county average of 55.8. It is roughly in line with the Kansas average of 53.2 and roughly in line with the national average of 53.2.

Against the Kansas average, its strongest sub-score is natural hazard (65 vs 64) and its weakest is power availability (30 vs 38). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Claud Davis Engraving BTA to power, fiber and other datacenters?

The nearest located transmission bottleneck is TMP338_28287 (SPP), 21 miles away. For connectivity, the nearest internet exchange facility is QTS Overland Park (OVP1) at 27.4 miles. 12 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is QTS Overland Park (OVP1), 27.4 miles away.

What are the flood, water and hazard risks at Claud Davis Engraving BTA?

At the county level, FEMA's National Risk Index rates Miami "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
55
Fiber connectivity12%
71
Energy cost10%
50
Water risk7%
52
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Miami, ranked by DC Readiness.

Sites near Claud Davis Engraving BTA
SiteTypeVoltageCapacityQueue waitScore
EC Near OsawatomieGreenfield——4.3 yrs61.3
UNKNOWN173427Substation-Adjacent161 kV100 MW4.3 yrs61.1
EC Near OsawatomieGreenfield——4.3 yrs59.8
EC Near OsawatomieGreenfield——4.3 yrs59.8
UNKNOWN118176Substation-Adjacent161 kV100 MW4.3 yrs59.5
EC Near OsawatomieGreenfield——4.3 yrs59.5
EC Near OsawatomieGreenfield——4.3 yrs59.0
EC Near OsawatomieGreenfield——4.3 yrs59.0

Claud Davis Engraving BTA: common questions

What is the DC Readiness score of Claud Davis Engraving BTA?

Claud Davis Engraving BTA scores 50.8/100 on the GridCensus DC Readiness scale, rated fair. It ranks 29th of 35 scored sites in Miami. The Miami average is 55.8 and the Kansas average is 53.2.

Which electric utility serves Claud Davis Engraving BTA?

HEARTLAND RURAL ELEC COOP, INC (not available) holds the retail service territory that contains the site.

What grid region is Claud Davis Engraving BTA in?

Claud Davis Engraving BTA is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Claud Davis Engraving BTA from an internet exchange?

The nearest internet exchange facility is QTS Overland Park (OVP1), about 27.4 miles away; 12 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Claud Davis Engraving BTA, Miami, KS”, https://gridcensus.com/datacenter-sites/kansas/miami/claud-davis-engraving-bta-7a41ce8d (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Claud Davis Engraving BTA, Miami is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.